NIKA2 Homepage

The New IRAM KID Array 2 (NIKA2) is a dual-band camera operating with three frequency-multiplexed kilopixels arrays of Lumped Element Kinetic Inductance Detectors (LEKID) cooled at 150mK. NIKA2 is designed to observe simultaneously the intensity at 1.15 and 2.0 mm. In addition, it allows for polarisation observations at 1.15 mm. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble, France).

NIKA2 in the web:


News

Overview

NIKA2 properties (valid after March 2025; still preliminary)

Band

Number of KIDs

Wavelength

Bandwidth

NEFD

HPBW

FoV

NIKA2 2 mm/150 GHz

616

2.00 mm

125-170 GHz

9 ± 1 mJy*s1/2

17.6"

6.5'

NIKA2 1 mm/260 GHz

2x1140

1.15 mm

200-320 GHz

16 mJy*s1/2

11.1"

6.5'

Changes after 2/2025 (1 mm bandwidth) and 1/2026 (1 mm NEFD) are marked in bold.

NIKA2 properties (valid till February 2025)

Band

Number of KIDs

Wavelength

Bandwidth

NEFD

HPBW

FoV

NIKA2 2 mm/150 GHz

616

2.00 mm

125-170 GHz

9 ± 1 mJy*s1/2

17.6"

6.5'

NIKA2 1 mm/260 GHz

2x1140

1.15 mm

240-280 GHz

30 ± 3 mJy*s1/2

11.1"

6.5'

Comments: The half-power beam widths and the NEFDs are taken from Perotto et al. 2020. The NEFDs are extrapolated to a sky opacity of 0 and 90 deg. elevation.

NIKA2 observing time estimator

A Python script to estimate observing times is available together with a document describing the approach and giving examples. Please find it here.

PIIC data reduction software

The PIIC software for the reduction of NIKA2 total-power and polarimetry data is available for download together with an extensive, regularly updated tutorial (see the PIIC dedicated page).


The five Guaranteed Time Large Programs

Five Large Programs (LPs) for NIKA2 in guaranteed time (GT) have been granted time in September 2016 and March 2017. The GT LPs in total power have been completed. Their sources are not "fenced" against new continuum 2mm/1mm mapping projects at the 30m or NOEMA. Only the B-FUN GT LP project in polarimetry is ongoing and continues to be "fenced". <CK 23-Jan-2026>

Publications

Go to the top


Information for Observers & Technical Documentation


Science runs (October 2017 - March 2026)

Current Semester: Winter 2025

Previous Semester: Summer 2025

Older Semesters

Go to the top


Commissioning & special test runs

Phase I [total power] (October 2015 - April 2017)

Phase II [Polarization, Tests] (June 2017 - September 2021)

Phase III [Commmissioning after upgrade of 30m servo system & new paint layer of M1] (January & August to September 2024)

Phase IV [NIKA2 upgrade & Re-commissioning] (March to October 2025)


Support teams

Go to top


Created: 2015.AUG.05 by Israel Hermelo. This page is maintained by AR, SL, CK, and the NIKA2 team.

Continuum/NIKA2/Main (last edited 2026-01-25 16:51:50 by CarstenKramer)