Back to the NIKA2 main page

NIKA2 run #44 (Aug 6th - Aug 29rd, 2020)

During this period, new panels were installed at the telescope pedestal. This work took place during day-time 08:00-19:00 or 20:00 local time. And to protect the telescope it was stopped at a fixed position in Azimuth and Elevation. In this very special mode, NIKA2 test data were taken.

Daily Reports

Nika2Run44 (last edited 2020-08-29 19:25:31 by CarstenKramer)