Differences between revisions 46 and 157 (spanning 111 versions)
Revision 46 as of 2005-11-10 02:44:53
Size: 915
Editor: mrt-aod
Comment:
Revision 157 as of 2009-09-25 15:28:10
Size: 2225
Editor: gra-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
attachment:logoiram.jpg This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should first read the [[IntoductionToThePool|Introduction to the Pool]]''.
Line 6: Line 6:
 * MAMBO pool data base: http://pool.iram.es
Line 7: Line 8:
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m.
The PoolProject relates the last news and the future projects for the Pool.
To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
<!> '''BOLOMETER CHECKLIST''' : BoloChkList
Line 11: Line 10:
== MAMBO pool observer schedules: ==
 
 * November 2009: PoolS09
 * Old schedule for Feb 2009: PoolW0809
 * Old schedule for Nov 2008: PoolS08
Line 12: Line 16:
------- == Pool Informations ==
 * Prepare the Pool observations: HowToPrepareThePool
Line 14: Line 19:
== Pool Sessions: ==  * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.
 * Quick data reduction for CLASS: [[attachment:ClassQuickReduction.pdf]]
 * Guide for Beam map observations (a.k.a. RCP map, flatfield): FlatField
 * Guide for absorber observations: AbsorberObs
Line 16: Line 27:
 * PoolS05 {*} (Current One)
 * PoolW0506
<!> Please, fill the [[http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html|Travel confirmation form]] before coming to the IRAM-30m telescope.
Line 19: Line 29:
------- == Contacts ==
 * ContactPersons: phone number, topic.
Line 21: Line 32:
== Pool Informations: == == Old Pages ==
Line 23: Line 34:
 * Prepare the Pool observations: HowToPrepareThePool We keep here some old pages for the pool whcih can be useful for the general informations but '''the commands should be checked in CookbookPako since they may have changed'''.
Line 25: Line 36:
 * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
 * Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
 * PoolProject (outdated) relates the last news and the future projects.
 * This page is reserved to the users who want to share informations: PoolUsers (outdated)
 * Known problems with the Pool: PoolSystemBugs
 * To reach the Pool Manager: ScheduleContactPoolManager
 * [[AbsorberTests|Absorber tests]] with the bolometer
 * [[PointingSources|Pointing Sources]] used for the bolometers.
 * How to do the observations: PoolSetup
Line 28: Line 46:
-------

== Pool Miscellaneous: ==

 * ContactPersons: phone number, topic.
 * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
 * Previous Pool Sessions:
  * OldPool sessions (logs).
  * PoolS05
  * PoolW0506
  * PoolS06
  * PoolW0607
  * PoolS07
  * PoolW0708

This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should first read the Introduction to the Pool.

<!> BOLOMETER CHECKLIST : BoloChkList

MAMBO pool observer schedules:

Pool Informations

<!> Please, fill the Travel confirmation form before coming to the IRAM-30m telescope.

Contacts

Old Pages

We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)