Differences between revisions 119 and 151 (spanning 32 versions)
Revision 119 as of 2008-10-17 13:47:53
Size: 2556
Editor: visitor7
Comment:
Revision 151 as of 2009-07-08 15:52:40
Size: 2165
Editor: gra-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
== Pool Database ==
 * http://pool.iram.es
-------
This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should first read the [[IntoductionToThePool|Introduction to the Pool]]''.
Line 8: Line 6:
!!! PLEASE NOTE THAT THIS PAGE IS UNDER REVISION AND MAY BE OUTDATED !!!  * MAMBO pool data base: http://pool.iram.es
Line 10: Line 8:
'''Bolometer Pool'''  '''BOLOMETER CHECKLIST''' : BoloChkList
Line 12: Line 10:
''The newcomers should read first that [:IntoductionToThePool:Introduction to the Pool]''. [[BR]]

This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

'''CONTENTS''' [[TableOfContents(3)]]

-------

== Pool Sessions ==
 * OldPool sessions (logs).
 * PoolS05
 * PoolW0506
 * PoolS06
 * PoolW0607
 * PoolS07
 * PoolW0708 {o} [Current]
 * PoolS08
-------
== MAMBO pool observer schedules: ==
 
 * February/March/April 2009: PoolW0809
 * Old schedule for Nov 08: PoolS08
Line 33: Line 16:
 * Prepare the Pool observations: HowToPrepareThePool
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup. You can find there the templates for the heterodyne macros.
 * This page is reserved to the users who want to share informations: PoolUsers
----
 * Known problems with the Pool: PoolSystemBugs
-------
== Pool Observers ==
 * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Prepare the Pool observations: HowToPrepareThePool

 * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
Line 43: Line 21:
 * To help the observers here are some PoolTips.
 * Quick data reduction for CLASS: attachment:ClassQuickReduction
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
 * To help the observers here are some PoolTips.
 * Quick data reduction for CLASS: [[attachment:ClassQuickReduction.pdf]]
 * Guide for flatfield observations: FlatField
 * Guide for absorber observations: AbsoberObs
Line 47: Line 26:
------- <!> Please, fill the [[http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html|Travel confirmation form]] before coming to the IRAM-30m telescope.
Line 49: Line 28:
== Technical Issues ==
 * [:AbsorberTests:Absorber tests] with the bolometer
 * [:PointingSources:Pointing Sources] used for the bolometers.
-------
== Contacts ==
 * ContactPersons: phone number, topic.
Line 54: Line 32:
Line 58: Line 37:
-------
== Pool Miscellaneous ==
 * ContactPersons: phone number, topic.
 * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
 * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
 * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc.
 * PoolProject (outdated) relates the last news and the future projects.
 * This page is reserved to the users who want to share informations: PoolUsers (outdated)
 * Known problems with the Pool: PoolSystemBugs
Line 65: Line 41:
 * [[AbsorberTests|Absorber tests]] with the bolometer
 * [[PointingSources|Pointing Sources]] used for the bolometers.
 * How to do the observations: PoolSetup

 * Previous Pool Sessions:
  * OldPool sessions (logs).
  * PoolS05
  * PoolW0506
  * PoolS06
  * PoolW0607
  * PoolS07
  * PoolW0708

This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should first read the Introduction to the Pool.

MAMBO pool observer schedules:

Pool Informations

<!> Please, fill the Travel confirmation form before coming to the IRAM-30m telescope.

Contacts

Old Pages

We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)