Differences between revisions 97 and 107 (spanning 10 versions)
Revision 97 as of 2007-02-19 14:06:17
Size: 2123
Editor: gra-lt6
Comment:
Revision 107 as of 2007-11-27 08:02:06
Size: 2340
Editor: lt-sl
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 * PoolW0607 {*} {Current}  * PoolW0607
 * PoolS07
{*} [Current]
 * PoolW0708
Line 34: Line 36:
 * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
 * Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
Line 37: Line 39:
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.  * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup. You can find there the templates for the heterodyne macros.
Line 50: Line 52:
 * Quick data reduction for CLASS: attachment:ClassQuickReduction
Line 57: Line 60:
 * [: AbosrbersTests: Absorber tests] with the bolometer  * [:AbsorberTests: Absorber tests] with the bolometer
 * [:PointingSources: Pointing Sources] used for the bolometers.

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup. You can find there the templates for the heterodyne macros.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Technical Issues


Pool Miscellaneous

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)