Differences between revisions 87 and 96 (spanning 9 versions)
Revision 87 as of 2006-04-18 11:07:43
Size: 2078
Editor: visitor9
Comment:
Revision 96 as of 2006-12-14 11:48:40
Size: 2024
Editor: 25
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
 * PoolS06 {*} {Coming one}  * PoolS06
 * PoolW0607
{*} {Current}
Line 26: Line 27:
 * http://mrt-lx2.iram.es/pooldatabase/index.php  * http://pool.iram.es
Line 50: Line 51:
<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope. <!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
Line 57: Line 58:
 * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]  * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
Line 59: Line 60:


{i} ''Note that this wiki is in development and a lot of informations are still missing...''
 * To reach the Pool Manager: ScheduleContactPoolManager

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Pool Miscellaneous

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)