Differences between revisions 85 and 106 (spanning 21 versions)
⇤ ← Revision 85 as of 2006-03-29 11:35:34 →
Size: 2107
Editor: visitor9
Comment:
← Revision 106 as of 2007-11-18 02:50:36 → ⇥
Size: 2282
Editor: ManuelRuiz
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
#acl PoolUsersGroup: read,write
Line 19: Line 20:
 * PoolS06 {*} {Coming one}  * PoolS06
 * PoolW0607
 * PoolS07 {*} [Current]
 * PoolW0708
Line 25: Line 29:
 * http://mrt-lx2.iram.es/pooldatabase/index.php  * http://pool.iram.es
Line 32: Line 36:
 * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
 * Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
Line 48: Line 52:
 * Quick data reduction for CLASS: attachment:ClassQuickReduction
Line 49: Line 54:
<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope. <!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

-------

== Technical Issues ==

 * [:AbsorberTests: Absorber tests] with the bolometer
 * [:PointingSources: Pointing Sources] used for the bolometers.
Line 56: Line 69:
 * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]  * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
Line 58: Line 71:


{i} ''Note that this wiki is in development and a lot of informations are still missing...''
 * To reach the Pool Manager: ScheduleContactPoolManager

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Technical Issues


Pool Miscellaneous

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)