Differences between revisions 80 and 102 (spanning 22 versions)
Revision 80 as of 2006-03-20 09:14:56
Size: 2045
Editor: visitor9
Comment:
Revision 102 as of 2007-10-08 15:58:06
Size: 2268
Editor: visitor14
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:

Line 15: Line 17:
 * OldPool sessions (logs).
Line 16: Line 19:
 * PoolW0506 {*} (Current One)
 * PoolS06
 * PoolW0506
 * PoolS06
 * PoolW0607
 * PoolS07 {*} [Current]
Line 23: Line 28:
 * http://mrt-lx2.iram.es/pooldatabase/index.php  * http://pool.iram.es
Line 46: Line 51:
 * Quick data reduction for CLASS: attachment:ClassQuickReduction
Line 47: Line 53:
<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope. <!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

-------

== Technical Issues ==

 * [:AbsorberTests: Absorber tests] with the bolometer
 * [:PointingSources: Pointing Sources] used for the bolometers.
Line 54: Line 68:
 * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]  * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
Line 56: Line 70:


{i} ''Note that this wiki is in development and a lot of informations are still missing...''
 * To reach the Pool Manager: ScheduleContactPoolManager

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Technical Issues


Pool Miscellaneous

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)