Differences between revisions 75 and 100 (spanning 25 versions)
Revision 75 as of 2006-02-17 10:41:15
Size: 1950
Editor: gra-lx11
Comment:
Revision 100 as of 2007-05-28 11:47:13
Size: 2201
Editor: lt-sl
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:

Line 7: Line 9:
Line 14: Line 17:
 * OldPool sessions (logs).
Line 15: Line 19:
 * PoolW0506 {*} (Current One)  * PoolW0506
 * PoolS06
 * PoolW0607
 * PoolS07
{*} [Current]
Line 21: Line 28:
 * http://mrt-lx2.iram.es/pooldatabase/index.php  * http://pool.iram.es
Line 32: Line 39:
 * This page is reserved to the users who want to share informations: PoolUsers
Line 44: Line 52:
<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope. <!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

-------

== Technical Issues ==

 * [:AbsorberTests: Absorber tests] with the bolometer
 * [:PointingSources: Pointing Sources] used for the bolometers.
Line 51: Line 67:
 * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]  * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
Line 53: Line 69:


{i} ''Note that this wiki is in development and a lot of informations are still missing...''
 * To reach the Pool Manager: ScheduleContactPoolManager

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Technical Issues


Pool Miscellaneous

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)