Differences between revisions 68 and 102 (spanning 34 versions)
Revision 68 as of 2005-12-05 05:27:33
Size: 1678
Editor: visitor15
Comment:
Revision 102 as of 2007-10-08 15:58:06
Size: 2268
Editor: visitor14
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:

Line 6: Line 8:
''The newcomers should read first that IntoductionToThePool''. [[BR]]
Line 9: Line 12:
[[TableOfContents(3)]]
-------

== Pool Sessions ==

 * OldPool sessions (logs).
 * PoolS05
 * PoolW0506
 * PoolS06
 * PoolW0607
 * PoolS07 {*} [Current]
Line 12: Line 26:
== Pool Sessions: == == Pool Database ==
Line 14: Line 28:
 * PoolS05
 * PoolW0506 {*} (Current One)

-------

== Pool Database: ==

 * http://mrt-lx2.iram.es/pooldatabase/index.php
 * http://pool.iram.es
Line 25: Line 32:
== Pool Informations: == == Pool Informations ==
Line 32: Line 39:
 * This page is reserved to the users who want to share informations: PoolUsers
Line 37: Line 45:
== Pool Observers: == == Pool Observers ==
Line 41: Line 49:
 * Cookbook to use MOPSIC: CookbookMopsic
Line 42: Line 51:
 * Quick data reduction for CLASS: attachment:ClassQuickReduction

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
Line 44: Line 56:
== Pool Miscellaneous: ==
== Technical Issues ==

 * [:AbsorberTests: Absorber tests] with the bolometer
 * [:PointingSources: Pointing Sources] used for the bolometers.


-------
== Pool Miscellaneous ==
Line 48: Line 68:
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]  * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
Line 50: Line 70:


{i} ''Note that this wiki is in development and a lot of informations are still missing...''
 * To reach the Pool Manager: ScheduleContactPoolManager

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Technical Issues


Pool Miscellaneous

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)