Differences between revisions 6 and 96 (spanning 90 versions)
Revision 6 as of 2005-10-19 15:53:31
Size: 329
Editor: gra-lx9
Comment:
Revision 96 as of 2006-12-14 11:48:40
Size: 2024
Editor: 25
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
#acl StephaneLeon:read,write RosaMontalban:admin,read,write VictorEspigares:admin,read,write All:read
Line 6: Line 5:
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m.
attachment:logoiram.jpg

''The newcomers should read first that IntoductionToThePool''. [[BR]]

This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

[[TableOfContents(3)]]
-------

== Pool Sessions ==

 * OldPool sessions (logs).
 * PoolS05
 * PoolW0506
 * PoolS06
 * PoolW0607 {*} {Current}

-------

== Pool Database ==

 * http://pool.iram.es
Line 9: Line 30:
== Pool Sessions: == -------
== Pool Informations ==
Line 11: Line 33:
 * PoolS05  * Prepare the Pool observations: HowToPrepareThePool
 * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
/!\ The observing instructions for NCS are not anymore valid in the old web pages.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 * This page is reserved to the users who want to share informations: PoolUsers
----
 
 * Known problems with the Pool: PoolSystemBugs
 
-------
== Pool Observers ==
Line 13: Line 46:
 * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.
Line 14: Line 51:
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
Line 15: Line 53:
''Oct. 19 2005 - StephaneLeon'' -------
== Pool Miscellaneous ==

 * ContactPersons: phone number, topic.
 * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
 * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
 * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc.
 * To reach the Pool Manager: ScheduleContactPoolManager

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Pool Miscellaneous

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)