Differences between revisions 59 and 81 (spanning 22 versions)
Revision 59 as of 2005-11-23 12:16:00
Size: 1319
Editor: visitor10
Comment:
Revision 81 as of 2006-03-21 08:49:49
Size: 2074
Editor: visitor9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
''The newcomers should read first that IntoductionToThePool''. [[BR]]
Line 9: Line 10:
[[TableOfContents(3)]]
-------

== Pool Sessions ==

 * OldPool sessions (logs).
 * PoolS05
 * PoolW0506 {*} (Current One)
 * PoolS06
Line 12: Line 22:
== Pool Sessions: == == Pool Database ==
Line 14: Line 24:
 * PoolS05
 * PoolW0506 {*} (Current One)
 * http://mrt-lx2.iram.es/pooldatabase/index.php
Line 18: Line 28:

== Pool Informations: ==
== Pool Informations ==
Line 25: Line 34:
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 * This page is reserved to the users who want to share informations: PoolUsers
Line 27: Line 37:
 * To help the observers here are some PoolTips.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 
Line 32: Line 41:
== Pool Observers ==
Line 33: Line 43:
== Pool Miscellaneous: ==  * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.

<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

-------
== Pool Miscellaneous ==
Line 37: Line 55:
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]  * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]
 * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc.

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • This page is reserved to the users who want to share informations: PoolUsers



Pool Observers

<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Pool Miscellaneous

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)