Differences between revisions 58 and 145 (spanning 87 versions)
⇤ ← Revision 58 as of 2005-11-23 12:15:32 →
Size: 1318
Editor: visitor10
Comment:
← Revision 145 as of 2009-01-27 16:24:14 → ⇥
Size: 2076
Editor: visitor3
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
attachment:logoiram.jpg This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should first read the [:IntoductionToThePool:Introduction to the Pool]''.
Line 6: Line 6:
 * MAMBO pool data base: http://pool.iram.es
Line 7: Line 8:
This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects. == MAMBO Pool W0809 February/March/April 2009 ==
 
 * MAMBO pool observer schedule: PoolW0809
Line 9: Line 12:
== MAMBO Pool S08: November 2008 ==
 
 * MAMBO pool observer schedule: PoolS08
Line 10: Line 16:
------- == Pool Informations ==
 * Prepare the Pool observations: HowToPrepareThePool
Line 12: Line 19:
== Pool Sessions: ==  * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.
 * Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
Line 14: Line 26:
 * PoolS05
 * PoolW0506 {*} (Current One)
== Contacts ==
 * ContactPersons: phone number, topic.
Line 17: Line 29:
------- == Old Pages ==
Line 19: Line 31:
== Pool Informations: == We keep here some old pages for the pool whcih can be useful for the general informations but '''the commands should be checked in CookbookPako since they may have changed'''.
Line 21: Line 33:
 * Prepare the Pool observations: HowToPrepareThePool
 * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
/!\ The observing instructions for NCS are not anymore valid in the old web page.
 * Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
 * PoolProject (outdated) relates the last news and the future projects.
 * This page is reserved to the users who want to share informations: PoolUsers (outdated)
 * Known problems with the Pool: PoolSystemBugs
 * To reach the Pool Manager: ScheduleContactPoolManager
 * [:AbsorberTests:Absorber tests] with the bolometer
 * [:PointingSources:Pointing Sources] used for the bolometers.
 * How to do the observations: PoolSetup
Line 26: Line 43:
----
 * To help the observers here are some PoolTips.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 * Known problems with the Pool: PoolSystemBugs
 
-------

== Pool Miscellaneous: ==

 * ContactPersons: phone number, topic.
 * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]


{i} ''Note that this wiki is in development and a lot of informations are still missing...''
 * Previous Pool Sessions:
  * OldPool sessions (logs).
  * PoolS05
  * PoolW0506
  * PoolS06
  * PoolW0607
  * PoolS07
  * PoolW0708

This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should first read the [:IntoductionToThePool:Introduction to the Pool].

MAMBO Pool W0809 February/March/April 2009

MAMBO Pool S08: November 2008

  • MAMBO pool observer schedule: PoolS08

Pool Informations

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

Contacts

Old Pages

We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)