Differences between revisions 53 and 138 (spanning 85 versions)
⇤ ← Revision 53 as of 2005-11-11 16:29:53 →
Size: 1228
Editor: mrt-aod
Comment:
← Revision 138 as of 2008-10-28 11:23:18 → ⇥
Size: 2387
Editor: visitor11
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
attachment:logoiram.jpg This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool]''.
Line 6: Line 6:

This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects. ''Note that this wiki is still in development and a lot of informations are still missing...''
== MAMBO Pool S08: November 2008 ==
 * MAMBO pool data base: http://pool.iram.es
 * MAMBO pool observer schedule: PoolS08
Line 12: Line 12:
== Pool Sessions: == !!! '''PLEASE NOTE THAT ALL INFORMATION BELOW IS UNDER REVISION AND MAY BE OUTDATED''' !!! (CK, 17.10.08)
Line 14: Line 14:
 * PoolS05 {*} (Current One) '''CONTENTS''' [[TableOfContents(3)]]

== Pool Informations ==
 * Prepare the Pool observations: HowToPrepareThePool (OK)
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup (OK, redundant information). You can find there the templates for the heterodyne macros.
 
 
-------
== Pool Observers ==
 * Notes for Observers: PoolObs (OK, very useful)
 * Cookbook to observe with {{{PaKo}}}: CookbookPako. (OK, very useful)
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips. (OK)
 * Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

== Pool Miscellaneous ==
 * ContactPersons: phone number, topic.

------

== Pool Sessions ==
 * OldPool sessions (logs).
 * PoolS05
Line 16: Line 39:
 * PoolS06
 * PoolW0607
 * PoolS07
 * PoolW0708 {o} [Current]
Line 19: Line 46:
== Pool Informations: == == Old Pages ==
Line 21: Line 48:
 * Prepare the Pool observations: HowToPrepareThePool
 * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
We keep here some old pages for the pool whcih can be useful for the general informations but '''the commands should be checked in CookbookPako since they may have changed'''.
Line 25: Line 50:
----
 * To help the observers here are some PoolTips.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 * Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
 * PoolProject (outdated) relates the last news and the future projects.
 * This page is reserved to the users who want to share informations: PoolUsers (outdated)
Line 29: Line 55:
  -------

== Pool Miscellaneous: ==

 * ContactPersons: phone number, topic.
 * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]
 * To reach the Pool Manager: ScheduleContactPoolManager
 * [:AbsorberTests:Absorber tests] with the bolometer
 * [:PointingSources:Pointing Sources] used for the bolometers.

This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool].

MAMBO Pool S08: November 2008


!!! PLEASE NOTE THAT ALL INFORMATION BELOW IS UNDER REVISION AND MAY BE OUTDATED !!! (CK, 17.10.08)

CONTENTS TableOfContents(3)

Pool Informations

  • Prepare the Pool observations: HowToPrepareThePool (OK)

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup (OK, redundant information). You can find there the templates for the heterodyne macros.


Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

Pool Miscellaneous


Pool Sessions


Old Pages

We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)