Differences between revisions 5 and 142 (spanning 137 versions)
Revision 5 as of 2005-10-19 15:51:07
Size: 288
Editor: gra-lx9
Comment:
Revision 142 as of 2008-10-28 13:36:37
Size: 1971
Editor: mrt-lx16
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
#acl StephaneLeon:read,write RosaMontalban:admin,read,write VictorEspigares:admin,read,write All:read
Line 5: Line 4:
This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool]''.
Line 6: Line 6:
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m. == MAMBO Pool S08: November 2008 ==
 * MAMBO pool data base: http://pool.iram.es
 * MAMBO pool observer schedule: PoolS08
Line 8: Line 10:
== Pool Informations ==
 * Prepare the Pool observations: HowToPrepareThePool
 * How to do the observations: PoolSetup
 * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.
 * Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
Line 9: Line 20:
== Pool Sessions: == == Contacts ==
 * ContactPersons: phone number, topic.
Line 11: Line 23:
 * PoolS05 == Old Pages ==

We keep here some old pages for the pool whcih can be useful for the general informations but '''the commands should be checked in CookbookPako since they may have changed'''.

 * Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
 * PoolProject (outdated) relates the last news and the future projects.
 * This page is reserved to the users who want to share informations: PoolUsers (outdated)
 * Known problems with the Pool: PoolSystemBugs
 * To reach the Pool Manager: ScheduleContactPoolManager
 * [:AbsorberTests:Absorber tests] with the bolometer
 * [:PointingSources:Pointing Sources] used for the bolometers.

 * Previous Pool Sessions:
  * OldPool sessions (logs).
  * PoolS05
  * PoolW0506
  * PoolS06
  * PoolW0607
  * PoolS07
  * PoolW0708

This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool].

MAMBO Pool S08: November 2008

Pool Informations

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

Contacts

Old Pages

We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)