2377
Comment:
|
1973
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
------- | == Pool Informations == * Prepare the Pool observations: HowToPrepareThePool |
Line 12: | Line 13: |
!!! '''PLEASE NOTE THAT ALL INFORMATION BELOW IS UNDER REVISION AND MAY BE OUTDATED''' !!! (CK, 17.10.08) '''CONTENTS''' [[TableOfContents(3)]] == Pool Informations == * Prepare the Pool observations: HowToPrepareThePool (OK) * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup (OK, redundant information). You can find there the templates for the heterodyne macros. ------- == Pool Observers == * Notes for Observers: PoolObs (OK, very useful) * Cookbook to observe with {{{PaKo}}}: CookbookPako. (OK, very useful) |
* Notes for Observers: PoolObs * Cookbook to observe with {{{PaKo}}}: CookbookPako. |
Line 26: | Line 16: |
* To help the observers here are some PoolTips. (OK) | * To help the observers here are some PoolTips. |
Line 32: | Line 22: |
------ == Pool Sessions == * OldPool sessions (logs). * PoolS05 * PoolW0506 * PoolS06 * PoolW0607 * PoolS07 * PoolW0708 {o} [Current] ------- |
|
Line 58: | Line 35: |
* How to do the observations: PoolSetup * Previous Pool Sessions: * OldPool sessions (logs). * PoolS05 * PoolW0506 * PoolS06 * PoolW0607 * PoolS07 * PoolW0708 |
This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool].
MAMBO Pool S08: November 2008
MAMBO pool data base: http://pool.iram.es
MAMBO pool observer schedule: PoolS08
Pool Informations
Prepare the Pool observations: HowToPrepareThePool
Notes for Observers: PoolObs
Cookbook to observe with PaKo: CookbookPako.
Cookbook to use MOPSIC: CookbookMopsic
To help the observers here are some PoolTips.
Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf
Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
Contacts
ContactPersons: phone number, topic.
Old Pages
We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.
Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
PoolProject (outdated) relates the last news and the future projects.
This page is reserved to the users who want to share informations: PoolUsers (outdated)
Known problems with the Pool: PoolSystemBugs
To reach the Pool Manager: ScheduleContactPoolManager
[:AbsorberTests:Absorber tests] with the bolometer
[:PointingSources:Pointing Sources] used for the bolometers.
How to do the observations: PoolSetup
- Previous Pool Sessions: