Differences between revisions 12 and 145 (spanning 133 versions)
Revision 12 as of 2005-10-19 16:18:05
Size: 319
Editor: gra-lx8
Comment:
Revision 145 as of 2009-01-27 16:24:14
Size: 2076
Editor: visitor3
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
#acl StephaneLeon:read,write,admin RosaMontalban:admin,read,write VictorEspigares:admin,read All:read
Line 5: Line 4:
This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should first read the [:IntoductionToThePool:Introduction to the Pool]''.

 * MAMBO pool data base: http://pool.iram.es

== MAMBO Pool W0809 February/March/April 2009 ==
Line 6: Line 10:
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m.  * MAMBO pool observer schedule: PoolW0809
Line 8: Line 12:
== MAMBO Pool S08: November 2008 ==
 
 * MAMBO pool observer schedule: PoolS08
Line 9: Line 16:
== Pool Sessions: == == Pool Informations ==
 * Prepare the Pool observations: HowToPrepareThePool
Line 11: Line 19:
 * PoolS05 {*} (Current One)
 * PoolW05
 * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.
 * Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

== Contacts ==
 * ContactPersons: phone number, topic.

== Old Pages ==

We keep here some old pages for the pool whcih can be useful for the general informations but '''the commands should be checked in CookbookPako since they may have changed'''.

 * Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
 * PoolProject (outdated) relates the last news and the future projects.
 * This page is reserved to the users who want to share informations: PoolUsers (outdated)
 * Known problems with the Pool: PoolSystemBugs
 * To reach the Pool Manager: ScheduleContactPoolManager
 * [:AbsorberTests:Absorber tests] with the bolometer
 * [:PointingSources:Pointing Sources] used for the bolometers.
 * How to do the observations: PoolSetup

 * Previous Pool Sessions:
  * OldPool sessions (logs).
  * PoolS05
  * PoolW0506
  * PoolS06
  * PoolW0607
  * PoolS07
  * PoolW0708

This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should first read the [:IntoductionToThePool:Introduction to the Pool].

MAMBO Pool W0809 February/March/April 2009

MAMBO Pool S08: November 2008

  • MAMBO pool observer schedule: PoolS08

Pool Informations

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

Contacts

Old Pages

We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)