2452
Comment:
|
2387
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
attachment:logoiram.jpg | |
Line 5: | Line 4: |
''The newcomers should read first that [:IntoductionToThePool:Introduction to the Pool]''. [[BR]] | This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool]''. |
Line 7: | Line 6: |
This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects. | == MAMBO Pool S08: November 2008 == * MAMBO pool data base: http://pool.iram.es * MAMBO pool observer schedule: PoolS08 ------- !!! '''PLEASE NOTE THAT ALL INFORMATION BELOW IS UNDER REVISION AND MAY BE OUTDATED''' !!! (CK, 17.10.08) |
Line 11: | Line 16: |
------- == Pool Sessions == * OldPool sessions (logs). * PoolS05 * PoolW0506 * PoolS06 * PoolW0607 * PoolS07 * PoolW0708 * PoolS08 ------- == Pool Database == * http://pool.iram.es ------- |
|
Line 28: | Line 17: |
* Prepare the Pool observations: HowToPrepareThePool * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup. You can find there the templates for the heterodyne macros. * This page is reserved to the users who want to share informations: PoolUsers ---- * Known problems with the Pool: PoolSystemBugs |
* Prepare the Pool observations: HowToPrepareThePool (OK) * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup (OK, redundant information). You can find there the templates for the heterodyne macros. |
Line 35: | Line 23: |
* Notes for Observers: PoolObs * Cookbook to observe with {{{PaKo}}}: CookbookPako. |
* Notes for Observers: PoolObs (OK, very useful) * Cookbook to observe with {{{PaKo}}}: CookbookPako. (OK, very useful) |
Line 38: | Line 26: |
* To help the observers here are some PoolTips. * Quick data reduction for CLASS: attachment:ClassQuickReduction |
* To help the observers here are some PoolTips. (OK) * Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf |
Line 41: | Line 29: |
== Contacts == * ContactPersons: phone number, topic. ------ |
|
Line 44: | Line 39: |
== Technical Issues == * [:AbsorberTests:Absorber tests] with the bolometer * [:PointingSources:Pointing Sources] used for the bolometers. ------- |
|
Line 49: | Line 40: |
Line 53: | Line 45: |
------- == Pool Miscellaneous == * ContactPersons: phone number, topic. * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page] * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter] * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc. |
* PoolProject (outdated) relates the last news and the future projects. * This page is reserved to the users who want to share informations: PoolUsers (outdated) * Known problems with the Pool: PoolSystemBugs |
Line 60: | Line 49: |
* [:AbsorberTests:Absorber tests] with the bolometer * [:PointingSources:Pointing Sources] used for the bolometers. * Previous Pool Sessions: * OldPool sessions (logs). * PoolS05 * PoolW0506 * PoolS06 * PoolW0607 * PoolS07 * PoolW0708 {o} |
This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool].
MAMBO Pool S08: November 2008
MAMBO pool data base: http://pool.iram.es
MAMBO pool observer schedule: PoolS08
!!! PLEASE NOTE THAT ALL INFORMATION BELOW IS UNDER REVISION AND MAY BE OUTDATED !!! (CK, 17.10.08)
CONTENTS TableOfContents(3)
Pool Informations
Prepare the Pool observations: HowToPrepareThePool (OK)
A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup (OK, redundant information). You can find there the templates for the heterodyne macros.
Pool Observers
Notes for Observers: PoolObs (OK, very useful)
Cookbook to observe with PaKo: CookbookPako. (OK, very useful)
Cookbook to use MOPSIC: CookbookMopsic
To help the observers here are some PoolTips. (OK)
Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf
Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
Contacts
ContactPersons: phone number, topic.
Old Pages
We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.
Observing Instructions SIS: http://mrt-lx3.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx3.iram.es/flexible/instruction.html
PoolProject (outdated) relates the last news and the future projects.
This page is reserved to the users who want to share informations: PoolUsers (outdated)
Known problems with the Pool: PoolSystemBugs
To reach the Pool Manager: ScheduleContactPoolManager
[:AbsorberTests:Absorber tests] with the bolometer
[:PointingSources:Pointing Sources] used for the bolometers.
- Previous Pool Sessions: