Differences between revisions 114 and 139 (spanning 25 versions)
Revision 114 as of 2008-04-24 10:25:50
Size: 2466
Editor: lt-sl
Comment:
Revision 139 as of 2008-10-28 11:24:11
Size: 2377
Editor: visitor11
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
attachment:logoiram.jpg
Line 5: Line 4:
''The newcomers should read first that [:IntoductionToThePool:Introduction to the Pool]''. [[BR]] This Wiki is dedicated to the '''Bolometer Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. ''Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool]''.
Line 7: Line 6:
This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects. == MAMBO Pool S08: November 2008 ==
 * MAMBO pool data base: http://pool.iram.es
 * MAMBO pool observer schedule: PoolS08

-------

!!! '''PLEASE NOTE THAT ALL INFORMATION BELOW IS UNDER REVISION AND MAY BE OUTDATED''' !!! (CK, 17.10.08)
Line 11: Line 16:
== Pool Informations ==
 * Prepare the Pool observations: HowToPrepareThePool (OK)
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup (OK, redundant information). You can find there the templates for the heterodyne macros.
 
 
Line 12: Line 22:
== Pool Observers ==
 * Notes for Observers: PoolObs (OK, very useful)
 * Cookbook to observe with {{{PaKo}}}: CookbookPako. (OK, very useful)
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips. (OK)
 * Quick data reduction for CLASS: attachment:ClassQuickReduction.pdf
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

== Contacts ==
 * ContactPersons: phone number, topic.

------
Line 20: Line 42:
 * PoolW0708 {*} [Current]
 * PoolS08
-------

== Pool Database ==
 * http://pool.iram.es
-------
== Pool Informations ==
 * Prepare the Pool observations: HowToPrepareThePool
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup. You can find there the templates for the heterodyne macros.
 * This page is reserved to the users who want to share informations: PoolUsers
----
 * Known problems with the Pool: PoolSystemBugs
-------
== Pool Observers ==
 * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.
 * Quick data reduction for CLASS: attachment:ClassQuickReduction
<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.
 * PoolW0708 {o} [Current]
Line 44: Line 46:
== Technical Issues ==
 * [:AbsorberTests:Absorber tests] with the bolometer
 * [:PointingSources:Pointing Sources] used for the bolometers.
-------
Line 49: Line 47:
Line 53: Line 52:
-------
== Pool Miscellaneous ==
 * ContactPersons: phone number, topic.
 * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
 * [http://mrt-lx3.iram.es/tau/taumeter.html Tau-meter]
 * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc.
 * PoolProject (outdated) relates the last news and the future projects.
 * This page is reserved to the users who want to share informations: PoolUsers (outdated)
 * Known problems with the Pool: PoolSystemBugs
Line 60: Line 56:
 * [:AbsorberTests:Absorber tests] with the bolometer
 * [:PointingSources:Pointing Sources] used for the bolometers.

This Wiki is dedicated to the Bolometer Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. Newcomers should read first that [:IntoductionToThePool:Introduction to the Pool].

MAMBO Pool S08: November 2008


!!! PLEASE NOTE THAT ALL INFORMATION BELOW IS UNDER REVISION AND MAY BE OUTDATED !!! (CK, 17.10.08)

CONTENTS TableOfContents(3)

Pool Informations

  • Prepare the Pool observations: HowToPrepareThePool (OK)

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup (OK, redundant information). You can find there the templates for the heterodyne macros.


Pool Observers

<!> Please, fill the [http://www.iram.fr/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

Contacts


Pool Sessions


Old Pages

We keep here some old pages for the pool whcih can be useful for the general informations but the commands should be checked in CookbookPako since they may have changed.

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)