Differences between revisions 72 and 73
Revision 72 as of 2005-12-19 18:29:00
Size: 1731
Editor: visitor15
Comment:
Revision 73 as of 2006-01-29 04:18:20
Size: 1878
Editor: visitor9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Line 44: Line 43:
<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

attachment:logoiram.jpg

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.



Pool Observers

<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Pool Miscellaneous

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)