Differences between revisions 69 and 71 (spanning 2 versions)
Revision 69 as of 2005-12-06 22:24:03
Size: 1700
Editor: visitor15
Comment:
Revision 71 as of 2005-12-12 11:59:54
Size: 1688
Editor: gra-lx9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
== Pool Sessions: == == Pool Sessions ==
Line 19: Line 19:
== Pool Database: == == Pool Database ==
Line 25: Line 25:
== Pool Informations: == == Pool Informations ==
Line 37: Line 37:
== Pool Observers: == == Pool Observers ==
Line 44: Line 44:
== Pool Miscellaneous: == == Pool Miscellaneous ==
Line 48: Line 48:
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]  * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]

attachment:logoiram.jpg

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.



Pool Observers


Pool Miscellaneous

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)