Differences between revisions 69 and 70
Revision 69 as of 2005-12-06 22:24:03
Size: 1700
Editor: visitor15
Comment:
Revision 70 as of 2005-12-07 03:31:54
Size: 1693
Editor: visitor15
Comment:
Deletions are marked like this. Additions are marked like this.
Line 48: Line 48:
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]  * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]

attachment:logoiram.jpg

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions:


Pool Database:


Pool Informations:

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.



Pool Observers:


Pool Miscellaneous:

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)