Differences between revisions 64 and 65
Revision 64 as of 2005-12-02 21:49:30
Size: 1547
Editor: visitor15
Comment:
Revision 65 as of 2005-12-02 21:50:56
Size: 1623
Editor: visitor15
Comment:
Deletions are marked like this. Additions are marked like this.
Line 48: Line 48:
 * Telescope characteristics (Receivers, Efficiencies, Backend, etc.):  * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc.

attachment:logoiram.jpg

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.


Pool Sessions:


Pool Database:


Pool Informations:

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.



Pool Observers:

  • Notes for Observers: PoolObs

  • To help the observers here are some PoolTips.


Pool Miscellaneous:

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)