Differences between revisions 60 and 78 (spanning 18 versions)
Revision 60 as of 2005-11-24 09:18:16
Size: 1406
Editor: visitor10
Comment:
Revision 78 as of 2006-02-22 10:10:08
Size: 1952
Editor: visitor4
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
''The newcomers should read first that IntoductionToThePool''. [[BR]]
Line 9: Line 10:
[[TableOfContents(3)]]
Line 12: Line 13:
== Pool Sessions: == == Pool Sessions ==
Line 19: Line 20:
== Pool Database: == == Pool Database ==
Line 25: Line 26:
== Pool Informations: == == Pool Informations ==
Line 31: Line 32:
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
Line 33: Line 34:
 * To help the observers here are some PoolTips.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 
Line 38: Line 38:
== Pool Observers ==
Line 39: Line 40:
== Pool Miscellaneous: ==  * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.

<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

-------
== Pool Miscellaneous ==
Line 43: Line 52:
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]  * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]
 * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc.

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.



Pool Observers

<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Pool Miscellaneous

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)