329
Comment:
|
915
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
#acl StephaneLeon:read,write RosaMontalban:admin,read,write VictorEspigares:admin,read,write All:read | |
Line 5: | Line 4: |
attachment:logoiram.jpg |
|
Line 7: | Line 8: |
The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS |
|
Line 8: | Line 11: |
------- |
|
Line 11: | Line 16: |
* PoolS05 | * PoolS05 {*} (Current One) * PoolW0506 |
Line 13: | Line 19: |
------- | |
Line 14: | Line 21: |
== Pool Informations: == | |
Line 15: | Line 23: |
''Oct. 19 2005 - StephaneLeon'' | * Prepare the Pool observations: HowToPrepareThePool * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html ------- == Pool Miscellaneous: == * ContactPersons: phone number, topic. * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page] |
attachment:logoiram.jpg
This Wiki aims to describe the news and the status of the Pool Observing at the IRAM-30m. The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
Pool Sessions:
Pool Informations:
Prepare the Pool observations: HowToPrepareThePool
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
Pool Miscellaneous:
ContactPersons: phone number, topic.
[http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]