Differences between revisions 55 and 78 (spanning 23 versions)
Revision 55 as of 2005-11-11 16:31:30
Size: 1232
Editor: mrt-aod
Comment:
Revision 78 as of 2006-02-22 10:10:08
Size: 1952
Editor: visitor4
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
''The newcomers should read first that IntoductionToThePool''. [[BR]]
Line 9: Line 10:
[[TableOfContents(3)]]
-------

== Pool Sessions ==

 * PoolS05
 * PoolW0506 {*} (Current One)
Line 12: Line 20:
== Pool Sessions: == == Pool Database ==
Line 14: Line 22:
 * PoolS05 {*} (Current One)
 * PoolW0506
 * http://mrt-lx2.iram.es/pooldatabase/index.php
Line 18: Line 26:

== Pool Informations: ==
== Pool Informations ==
Line 24: Line 31:
/!\ The observing instructions for NCS are not anymore valid in the old web pages.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
Line 26: Line 34:
 * To help the observers here are some PoolTips.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 
Line 31: Line 38:
== Pool Observers ==
Line 32: Line 40:
== Pool Miscellaneous: ==  * Notes for Observers: PoolObs
 * Cookbook to observe with {{{PaKo}}}: CookbookPako.
 * Cookbook to use MOPSIC: CookbookMopsic
 * To help the observers here are some PoolTips.

<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.

-------
== Pool Miscellaneous ==
Line 36: Line 52:
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]  * [http://mrt-lx2.iram.es/tau/taumeter.html Tau-meter]
 * [http://www.iram.es/IRAMES/telescope/telescopeSummary/telescope_summary.html Telescope characteristics]: Receivers, Efficiencies, Backend, etc.

attachment:logoiram.jpg

The newcomers should read first that IntoductionToThePool. BR

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.

TableOfContents(3)


Pool Sessions


Pool Database


Pool Informations

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.



Pool Observers

<!> Please, fill the [http://www.iram.es/IRAMFR/PV/obs_request/formulaire.html Travel confirmation form] before coming to the IRAM-30m telescope.


Pool Miscellaneous

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)