Differences between revisions 46 and 51 (spanning 5 versions)
Revision 46 as of 2005-11-10 02:44:53
Size: 915
Editor: mrt-aod
Comment:
Revision 51 as of 2005-11-10 04:25:51
Size: 1133
Editor: mrt-aod
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m.
The PoolProject relates the last news and the future projects for the Pool.
To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.
Line 24: Line 22:
Line 28: Line 25:
----
 * To help the observers here are some PoolTips.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
 * Know problems with the Pool: PoolSystemBugs
 
Line 34: Line 36:
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]

attachment:logoiram.jpg

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.


Pool Sessions:


Pool Informations:


  • To help the observers here are some PoolTips.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.

  • Know problems with the Pool: PoolSystemBugs


Pool Miscellaneous:

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)