|
Size: 667
Comment:
|
Size: 744
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 4: | Line 4: |
| attachment::logoiram.jpg | attachment:logoiram.jpg |
| Line 9: | Line 9: |
------- |
|
| Line 15: | Line 18: |
| ------ | |
| Line 18: | Line 22: |
| * Prepare the Pool observations: HowToPrepareThePool |
attachment:logoiram.jpg
This Wiki aims to describe the news and the status of the Pool Observing at the IRAM-30m. The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
Pool Sessions:
Pool Informations:
Prepare the Pool observations: HowToPrepareThePool
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
