672
Comment:
|
923
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
# attachment:pool-logo.png | attachment:logoiram.jpg |
Line 6: | Line 6: |
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m. The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS |
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m. PoolProject relates the last news and the future projects for the Pool. ------- |
Line 15: | Line 17: |
------- | |
Line 18: | Line 21: |
* Prepare the Pool observations: HowToPrepareThePool | |
Line 20: | Line 24: |
---- * To help the observers here are some PoolTips. * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS. ------- == Pool Miscellaneous: == * ContactPersons: phone number, topic. * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page] |
attachment:logoiram.jpg
This Wiki aims to describe the news and the status of the Pool Observing at the IRAM-30m. PoolProject relates the last news and the future projects for the Pool.
Pool Sessions:
Pool Informations:
Prepare the Pool observations: HowToPrepareThePool
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
To help the observers here are some PoolTips.
A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
Pool Miscellaneous:
ContactPersons: phone number, topic.
[http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]