670
Comment:
|
745
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
attachment:pool-logo.png | attachment:logoiram.jpg |
Line 9: | Line 9: |
------- |
|
Line 15: | Line 18: |
------- | |
Line 18: | Line 22: |
* Prepare the Pool observations: HowToPrepareThePool |
attachment:logoiram.jpg
This Wiki aims to describe the news and the status of the Pool Observing at the IRAM-30m. The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
Pool Sessions:
Pool Informations:
Prepare the Pool observations: HowToPrepareThePool
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html