Differences between revisions 17 and 63 (spanning 46 versions)
Revision 17 as of 2005-10-22 14:19:24
Size: 369
Editor: mrt-lx2
Comment:
Revision 63 as of 2005-11-30 21:18:21
Size: 1474
Editor: mrt-lx7
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
[[Date(2005-10-22T14:19:24Z)]]
 
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m.
The PoolProject relates the last news and the future projects for the Pool.
To help the observers here are some PoolTips.

attachment:logoiram.jpg


This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.


-------
Line 11: Line 14:
 * PoolS05 {*} (Current One)
 * PoolW05
 * PoolS05
 * PoolW0506 {*} (Current One)

-------

== Pool Database: ==

 * http://mrt-lx2.iram.es/pooldatabase/index.php


-------
== Pool Informations: ==

 * Prepare the Pool observations: HowToPrepareThePool
 * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
 * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
/!\ The observing instructions for NCS are not anymore valid in the old web pages.
 * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
----
 
 * Known problems with the Pool: PoolSystemBugs
 
-------
== Pool Observers: ==

 * Notes for Observers: PoolObs
 * To help the observers here are some PoolTips.

-------
== Pool Miscellaneous: ==

 * ContactPersons: phone number, topic.
 * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
 * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]


{i} ''Note that this wiki is in development and a lot of informations are still missing...''

attachment:logoiram.jpg

This Wiki is dedicated to the Pool Observing at the IRAM-30m. The Pool Observing is organized to optimize the observing time at the telescope, especially during winter with the bolometer projects. PoolProject relates the last news and the future projects.


Pool Sessions:


Pool Database:


Pool Informations:

/!\ The observing instructions for NCS are not anymore valid in the old web pages.

  • A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.



Pool Observers:

  • Notes for Observers: PoolObs

  • To help the observers here are some PoolTips.


Pool Miscellaneous:

{i} Note that this wiki is in development and a lot of informations are still missing...

PoolObserving (last edited 2011-10-20 22:13:50 by lt-ck)