216
Comment:
|
745
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
attachment:logoiram.jpg |
|
Line 6: | Line 7: |
The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS |
|
Line 7: | Line 10: |
------- |
|
Line 11: | Line 16: |
* PoolW05 | * PoolW0506 ------- == Pool Informations: == * Prepare the Pool observations: HowToPrepareThePool * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html |
attachment:logoiram.jpg
This Wiki aims to describe the news and the status of the Pool Observing at the IRAM-30m. The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
Pool Sessions:
Pool Informations:
Prepare the Pool observations: HowToPrepareThePool
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html