318
Comment:
|
949
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
#acl StephaneLeon:read,write,admin RosaMontalban:admin,read,write VictorEspigares:admin,read All:read | |
Line 5: | Line 4: |
attachment:logoiram.jpg | |
Line 6: | Line 6: |
This Wiki aims to describe the news and the status of the '''Pool Observing''' at the IRAM-30m. | |
Line 8: | Line 7: |
This Wiki is dedicated to the '''Pool Observing''' at the IRAM-30m. PoolProject relates the last news and the future projects. ------- |
|
Line 12: | Line 15: |
* PoolW05 | * PoolW0506 ------- == Pool Informations: == * Prepare the Pool observations: HowToPrepareThePool * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html ---- * To help the observers here are some PoolTips. * A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS. ------- == Pool Miscellaneous: == * ContactPersons: phone number, topic. * [http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page] * [http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter] |
attachment:logoiram.jpg
This Wiki is dedicated to the Pool Observing at the IRAM-30m. PoolProject relates the last news and the future projects.
Pool Sessions:
Pool Informations:
Prepare the Pool observations: HowToPrepareThePool
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html
To help the observers here are some PoolTips.
A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS.
Pool Miscellaneous:
ContactPersons: phone number, topic.
[http://www.mpifr-bonn.mpg.de/staff/bertoldi/mambo/index.html MPIfR MAMBO page]
[http://www.iram.es/IRAMES/weather/tauMeter.html Tau-meter]