Differences between revisions 19 and 20
Revision 19 as of 2010-09-03 15:07:46
Size: 1285
Comment:
Revision 20 as of 2010-09-03 15:09:04
Size: 1297
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
[[NikaRun2|ListAstroTarget]] [[ListAstroTargetNika2|ListAstroTarget]]

NIKA run #2 (19. - 26. Oct 2010, week 42)

Back to the NIKA main page

Staffing of the test run (DRAFT by CK, 2.9.2010)

The total number of rooms at the Pico is 14.

  • IRAM/Granada (9 rooms minimum during the week, 7 rooms at weekends):
    • Operators: J.L.Santarén (day time), F.Damour (night time) (2 rooms)
    • J.Penalver (1 room, Mon-Wed), S.Sanchez (Wed-Fri)
    • Astronomers of Duty / Friend of the instrument: D.Riquelme or G.Quintana-Lacaci (1 room)
    • Receiver group: Dave John or Santiago Navarro ? (1 room)
    • Computer group: Walter Brunswig or Albrecht Sievers ? (1 room)
    • Additional 2 rooms are the minimum needed for cooks and cleaning personal.
  • IRAM/Grenoble: Samuel Leclercq or Markus Roesch or Robert Zylka or Karl Schuster ? (2 at a time, 2 rooms)
  • Visitors from Neel, LAOG, AIG Cardiff, SRON Utrecht, Groningen: *upto 4 rooms during the week* may be used by the visitors. Double occupancy is an option, but the cooks would need to be informed beforehand of this extra load. If more visitors are essential, they'd need to stay over night in the nearby ski resort Pradollano, e.g. at the hotel Kenia.

List of astronomical target (DRAFT by FXD, 3.9.2010)

ListAstroTarget

NikaRun2 (last edited 2011-07-12 10:44:24 by lt-ck)