Differences between revisions 1 and 23 (spanning 22 versions)
Revision 1 as of 2010-09-01 13:13:35
Size: 64
Comment:
Revision 23 as of 2010-09-13 14:48:14
Size: 3897
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= NIKA run #2 = = NIKA run #2 (13. - 25. Oct 2010, week 42) =
Line 3: Line 3:
[NeelBolometer|Back to the NIKA main page]] [[NeelBolometer|Back to the NIKA main page]]
= 2nd test run of NIKA at the IRAM 30m telescope =


---- /!\ '''Edit conflict - other version:''' ----
== Test run plan: 14.10. - 25.10.2009 ==
[[http://www.iram.fr/IRAMFR/PV/sche/sche.html|Telescope Schedule]]

---- /!\ '''Edit conflict - your version:''' ----
== Test run plan: 14.10. - 25.10.2009 ==
[[http://www.iram.fr/IRAMFR/PV/sche/sche.html|Telescope Schedule]]

---- /!\ '''End of edit conflict''' ----

|| '''#''' || '''Dates''' || '''Main Task''' || '''Details''' || '''Lead (IRAM/Neel)''' || '''Support''' ||
|| || 13.10. || || Arrival of first visitors in Granada || || ||
|| || 14.10. Thursday || Arrival of truck, mount and cool down || Limited access to Rx-Cabin: 4 hours in afternoon || Samuel/Alain || ||
|| || 15.10. Friday || Cool down / system checks || Limited access to Rx-Cabin: 2 hours in afternoon || Samuel/Alain || ||
|| || 16.10. Saturday || Optical alignment (incl. removal of M3) || Limited access to Rx-Cabin: 2 hours in afternoon || Samuel/Alain || ||
|| || 17.10. Sunday || Bright sources optical model || Limited access to Rx-Cabin: 2 hours in afternoon || Clemens/Alain || ||
|| || 18.10. Monday || Observations '''T16-10''' || 6h30 - 20h30 || Samuel/Alain || ||
|| || 19.10. Tuesday || Observations '''T16-10''' || 17h30 - 2h30 || Samuel/Alain || ||
|| || 20.10. We. - 21.10 Th. || Observations '''T16-10''' || 14h30 - 2h30 || Samuel/Alain || ||
|| || 22.10. Friday || Observations '''T16-10''' || 9h00 - 21h00 || Samuel/Alain || ||
|| || 23.10. Saturday || Observations '''T16-10''' || 18h00 - 6h00 || Samuel/Alain || ||
|| || 24.10. Sunday || Observations '''T16-10'''|| 14h30 - 2h30 || Samuel/Alain || ||
|| || 25.10. || Warm up, dismount || Free Rx cabin for 11h00 || || ||


---- /!\ '''Edit conflict - other version:''' ----
[[attachment:NIKArun2_Schedule.htm|htm page of the Run schedule]]

---- /!\ '''Edit conflict - your version:''' ----

---- /!\ '''End of edit conflict''' ----

---- /!\ '''Edit conflict - other version:''' ----

---- /!\ '''Edit conflict - your version:''' ----
[[NIKArun2_Schedule.htm|htm page of the Run schedule]]

---- /!\ '''End of edit conflict''' ----

== Staffing of the test run (DRAFT by CK, 2.9.2010) ==

The total number of rooms at the Pico is 14.

 * IRAM/Granada (9 rooms minimum during the week, 7 rooms at weekends):
   * Operators: J.L.Santarén (day time), F.Damour (night time) (2 rooms)
   * J.Penalver (1 room, Mon-Wed), S.Sanchez (Wed-Fri)
   * Astronomers of Duty / Friend of the instrument: D.Riquelme or G.Quintana-Lacaci (1 room)
   * Receiver group: Dave John or Santiago Navarro ? (1 room)
   * Computer group: Walter Brunswig or Albrecht Sievers ? (1 room)
   * Additional 2 rooms are the minimum needed for cooks and cleaning personal.
 * IRAM/Grenoble: Samuel Leclercq or Markus Roesch or Robert Zylka or Karl Schuster ? (2 at a time, 2 rooms)
 
 * Visitors from Neel, LAOG, AIG Cardiff, SRON Utrecht, Groningen: *upto 4 rooms during the week* may be used by the visitors. Double occupancy is an option, but the cooks would need to be informed beforehand of this extra load. If more visitors are essential, they'd need to stay over night in the nearby ski resort Pradollano, e.g. at the hotel Kenia.


---- /!\ '''Edit conflict - other version:''' ----
[[attachment:Schedule_NIKA_visitors_Oct2010.htm|htm page of the NIKA staff schedule]]

---- /!\ '''Edit conflict - your version:''' ----
[[attachment:Schedule_NIKA_visitors_Oct2010.htm|htm page of the NIKA staff schedule]]

---- /!\ '''End of edit conflict''' ----
NOT DEFINITIVE YET (uncertain dates in pastel colors)

=== List of astronomical target (DRAFT by FXD, 3.9.2010) ===

[[ListAstroTargetNika2|ListAstroTarget]]

NIKA run #2 (13. - 25. Oct 2010, week 42)

Back to the NIKA main page

2nd test run of NIKA at the IRAM 30m telescope


/!\ Edit conflict - other version:


Test run plan: 14.10. - 25.10.2009

Telescope Schedule


/!\ Edit conflict - your version:


Test run plan: 14.10. - 25.10.2009

Telescope Schedule


/!\ End of edit conflict


#

Dates

Main Task

Details

Lead (IRAM/Neel)

Support

13.10.

Arrival of first visitors in Granada

14.10. Thursday

Arrival of truck, mount and cool down

Limited access to Rx-Cabin: 4 hours in afternoon

Samuel/Alain

15.10. Friday

Cool down / system checks

Limited access to Rx-Cabin: 2 hours in afternoon

Samuel/Alain

16.10. Saturday

Optical alignment (incl. removal of M3)

Limited access to Rx-Cabin: 2 hours in afternoon

Samuel/Alain

17.10. Sunday

Bright sources optical model

Limited access to Rx-Cabin: 2 hours in afternoon

Clemens/Alain

18.10. Monday

Observations T16-10

6h30 - 20h30

Samuel/Alain

19.10. Tuesday

Observations T16-10

17h30 - 2h30

Samuel/Alain

20.10. We. - 21.10 Th.

Observations T16-10

14h30 - 2h30

Samuel/Alain

22.10. Friday

Observations T16-10

9h00 - 21h00

Samuel/Alain

23.10. Saturday

Observations T16-10

18h00 - 6h00

Samuel/Alain

24.10. Sunday

Observations T16-10

14h30 - 2h30

Samuel/Alain

25.10.

Warm up, dismount

Free Rx cabin for 11h00


/!\ Edit conflict - other version:


htm page of the Run schedule


/!\ Edit conflict - your version:



/!\ End of edit conflict



/!\ Edit conflict - other version:



/!\ Edit conflict - your version:


htm page of the Run schedule


/!\ End of edit conflict


Staffing of the test run (DRAFT by CK, 2.9.2010)

The total number of rooms at the Pico is 14.

  • IRAM/Granada (9 rooms minimum during the week, 7 rooms at weekends):
    • Operators: J.L.Santarén (day time), F.Damour (night time) (2 rooms)
    • J.Penalver (1 room, Mon-Wed), S.Sanchez (Wed-Fri)
    • Astronomers of Duty / Friend of the instrument: D.Riquelme or G.Quintana-Lacaci (1 room)
    • Receiver group: Dave John or Santiago Navarro ? (1 room)
    • Computer group: Walter Brunswig or Albrecht Sievers ? (1 room)
    • Additional 2 rooms are the minimum needed for cooks and cleaning personal.
  • IRAM/Grenoble: Samuel Leclercq or Markus Roesch or Robert Zylka or Karl Schuster ? (2 at a time, 2 rooms)
  • Visitors from Neel, LAOG, AIG Cardiff, SRON Utrecht, Groningen: *upto 4 rooms during the week* may be used by the visitors. Double occupancy is an option, but the cooks would need to be informed beforehand of this extra load. If more visitors are essential, they'd need to stay over night in the nearby ski resort Pradollano, e.g. at the hotel Kenia.


/!\ Edit conflict - other version:


htm page of the NIKA staff schedule


/!\ Edit conflict - your version:


htm page of the NIKA staff schedule


/!\ End of edit conflict


NOT DEFINITIVE YET (uncertain dates in pastel colors)

List of astronomical target (DRAFT by FXD, 3.9.2010)

ListAstroTarget

NikaRun2 (last edited 2011-07-12 10:44:24 by lt-ck)