⇤ ← Revision 1 as of 2020-08-06 14:24:19
Size: 149
Comment:
|
Size: 355
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
During this period, new panels were installed at the telescope pedestal and the telescope was stopped at a fixed position in Azimuth and Elevation. In this very special mode, NIKA2 test data were taken. |
NIKA2 run #44 (Aug 6th - Aug 29rd, 2020)
During this period, new panels were installed at the telescope pedestal and the telescope was stopped at a fixed position in Azimuth and Elevation. In this very special mode, NIKA2 test data were taken.