Differences between revisions 86 and 89 (spanning 3 versions)
Revision 86 as of 2011-04-20 12:26:09
Size: 902
Editor: PabloMellado
Comment:
Revision 89 as of 2011-06-22 10:53:12
Size: 1058
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * Overall coordinator: Samuel Leclercq (IRAM/Grenoble)  * Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)
Line 18: Line 18:

== to do list ==

 * ToDoList (restricted access)
Line 22: Line 27:
[[GismoRun4|Go to the 4th run Wiki page]] [[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information)

GISMO (Goddard-IRAM Superconducting 2 Millimeter Observer): a Transition Edge Sensors bolometer camera for the IRAM 30m telescope

This page is maintained by CK, SL, and the GISMO team


People

  • GISMO team: Johannes Staguhn <johannes.g.staguhn@nasa.gov> (PI), Elmer Sharp, Steve Maher, Dominic Benford, Dale Fixen, Attila Kovacs

  • Overall coordinator: Samuel Leclercq <leclercq@iram.fr> (IRAM/Grenoble)

  • Main contact IRAM/Granada: Carsten Kramer (station manager)

to do list


4th test run, April 2011

Go to the 4th run Wiki page (restricted access, please send an email to SL to obtain the login information)

3rd test run, April 2010

Go to the 3rd run Wiki page

2nd test run, October 2008

Go to the 2nd run Wiki page

1st test run, November 2007

Go to the 1st run Wiki page

GoddardIramSuperconductingTwoMillimeterCamera (last edited 2014-03-31 13:30:45 by gra-lx17)