Test polarized observations. Test new !PaKo features (see [[/Continuum/NIKA/WishList| wish list]]). Test diode calibrator prototype. Test pipeline upgrades. 60h total. About 8h/day. Leave the cryostat cold and ready for the scientific run (run #10, Pool #2) in November 2014. | '''Test polarized observations. Test diode calibrator prototype.''' Test new !PaKo features (see [[Continuum/NIKA/WishList| wish list]]). Test pipeline upgrades.<<BR>> 60h total, bout 8h/day. Leave the cryostat cold and ready for the scientific run (run #10, Pool #2) in November 2014 ? |
Line 11: | Line 12: |
1. Test PaKo upgrades. (3h) | 1. Test !PaKo upgrades. (3h) |
Line 19: | Line 20: |
[[http://www.iram.fr/IRAMFR/PV/sche/14/s41v2.html|Telescope Schedule T21-13]] | [[http://www.iram.fr/IRAMFR/PV/sche/14/s41v2.html|Telescope Schedule T21-14]] |
Line 21: | Line 22: |
October presence at Pico (Dash (-) is for travel with night in the Granada office room on 1stDayAtPico-1, and go down from Pico and travel on !FinalDayAtPico+1, X is night at Pico) | October presence at Pico (Dash (-) is for travel with night in the Granada office room on !1stDayAtPico-1, and go down from Pico and travel on !FinalDayAtPico+1, X is night at Pico) |
Line 23: | Line 24: |
|| Andrea C. || - || X || X || X || X || X || X || X || X || X || - || || || || || || Nicolas P.|| || || || - || X || X || X || X || X || X || X || - || || || || || || Alessia R.|| || || || || || || || - || X || X || X || X || X || X || X || - || || Alain B. || || || || || - || X || X || X || X || X || - || || || || || || || Samuel L. || || || || || || || || - || X || X || X || X || X || X || X || - || || Reveret V.|| || || || || || || || || || || - || X || X || X || X || - || || Maury A. || || || || || || || || || || || - || X || X || X || X || - || || Number of people || 0 || 1 || 1 || 1 || 2 || 4 || 4 || 4 || 7 || 6 || 4 || 4 || 4 || 4 || 4 || 0 || || Min room requirement*|| 0 || 1 || 1 || 1 || 1 || 2 || 2 || 2 || 4 || 3 || 3 || 3 || 3 || 3 || 3 || 0 || * Min room requirement gives the minimal number of room required at the telescope, implying several persons can share room in case the occupancy at the telescope is such that single rooms can't be provided to all (according to Dec 5 2013's status of the telescope room schedule everybody can have a single room; except maybe the 21 and 22 a double room might be necessary). |
|| Andrea C. || X || X || X || X || X || X || X || X || X || X || X || X || X || X || - || || Nicolas P.|| || || - || X || X || X || X || X || X || X || X || X || X || X || - || || Alessia R.|| || || - || X || X || X || X || X || X || X || X || X || X || X || - || || Alain B. || || || || || || || || || X || X || X || X || X || X || - || || Samuel L. || || || || || || || || || X || X || X || X || X || X || - || || Reveret V.|| || || || || || || || || X || X || X || X || X || X || - || || Maury A. || || || || || || || - || X || X || X || - || || || || || || Number of people || 1 || 1 || 1 || 3 || 3 || 3 || 3 || 4 || 7 || 7 || 6 || 6 || 6 || 6 || 0 || || Min room requirement*|| 1 || 1 || 1 || 2 || 2 || 2 || 2 || 3 || 4 || 4 || 4 || 4 || 4 || 4 || 0 || * Min room requirement gives the minimal number of room required at the telescope, implying several persons can share room in case the occupancy at the telescope is such that single rooms can't be provided to all. |
Line 34: | Line 35: |
|| Alessandro M.|| || || || || - || X || X || X || X || - || - || || || || || || || Martino C.|| || || || || || || || - || X || X || X || X || X || X || X || - || |
|
Line 37: | Line 36: |
January presence at Grenoble, for offline data analysis || '''Name''' || '''Fri 17'''|| '''Sat 18'''||'''Sun 19'''|| '''Mon 20'''||'''Tue 21'''||'''Wed 22'''||'''Thu 23'''||'''Fri 24'''|| '''Sat 25'''||'''Sun 26'''||'''Mon 27'''|| || Rémi A. || X || X || X || X || X || X || X || X || X || X || X || || Juan M-P || X || X || X || || || || X || X || X || X || X || || Xavier D. || X || X || X || X || X || X || X || X || X || X || X || || Nicolas P. || || || || || || || || || X || X || X || || Frederic M || || X || X || X (matin) || X (apres midi) || X || X || X || || || X (matin)|| || Laurence P || || || || || X || X || || X || X? || X? || || || Guilaine L. || || || || || X || || || || || || X || || Alexandre B. || || || || || X || || || || || || X || || Andrea C. || || || || || || || || X || X || X || X || || Barbara C. || X || X || X || X || X || X || || X (matin) || || || || |
Presence at Grenoble, for off line data analysis || '''Name''' ||'''Tue 7'''||'''Wed 8'''||'''Thu 9'''||'''Fri 10'''|| '''Sat 11'''||'''Sun 12'''||'''Mon 13'''||'''Tue 14'''|| || Alessandro M.|| || || || || || || || || || Martino C. || || || || || || || || || || Rémi A. || || || || || || || || || || Juan M-P. || || || || || || || || || || Xavier D. || X || || X || X || X || X || || || || Frederic M || || || || || || || || || || Laurence P || || || || || || || || || || Guilaine L. || || || || || || || || || || Alexandre B. || || || || || || || || || || Barbara C. || || || || || || || || || |
Line 51: | Line 52: |
*18-20h (Local time) on 18, 19 and 20 January 2014 *17h30-7h (Local time) on the night 21-22 January 2014 *13-01h on the night 22-23 January 2014 *17-01h on 23, 24, 25, 26, et 27 January 2014 |
*17h30-2h (Local time) on 7 October 2014 *20h-5h (Local time) on the nights 8-10 October 2014 *2h-10h on the night 12 October 2014 *2h-11h on the night 13 October 2014 *3h-10h30 on the night 14 October 2014 |
Line 58: | Line 60: |
*14/1 Day-6 (Tu 14/1): Start cooling down (during mainteinance). Remotely with support in the cabin. *17/1 Days -3 (Fr) Arrival Alain, Andrea, Alessandro, Nicolas. *Days -2 (Sa), -1 (Su), 0 (Mo): KID tuning and technical tests. *21/1 Day1. Arrival of Martino, Samuel, Alessia, Xavier. Leaving: Alain ??. Intens; OTF_geometry Uranus. Pointing model. *Day2 (We): Polar; debug *23/1 Day3. Leaving Alessandro, Nicolas. (Th): Intens; Validate all sequences *Day4 (Fr): Polar; Planets, quasars *Day5 (Sa): Intens; Validate integration time *Day6 (Su): Polar; Crab Orion *Day7 (Mo): Backup == Travel plans == TBW |
*1/10 Day-6 (We 1/10): Start cooling down (during mainteinance). Remotely with support in the cabin. *Days -2 (Su), -1 (Mo), 0 (Tu): KID tuning and technical tests. *8/10 Day1. Intens; OTF_geometry Uranus. Pointing model. *Day2 : Polar; debug *Day3 : Intens; Validate all sequences *Day4 : Polar; Planets, quasars *Day5 : Intens; Validate integration time *Day6 : Polar; Crab Orion *Day7 : Backup |
NIKA run #9 October 2014
Goals of the run
Test polarized observations. Test diode calibrator prototype. Test new PaKo features (see wish list). Test pipeline upgrades.
60h total, bout 8h/day. Leave the cryostat cold and ready for the scientific run (run #10, Pool #2) in November 2014 ?
- Startup and check instrument is working well; freq sweep, tune and check valid pixels. Check previous pointing model (runs #7, #8) still valid. (4h)
- Validate all sequences (pointing, focus, skydip, zigzag otf map, Lissajou map). (4h)
Test PaKo upgrades. (3h)
Commission the instrument using statistics on beam maps ==> FOV geometry, flat field for each array, detectors stability, parasitic effects such as cross-talk, plateau, oscillations and so on. (10h)
- Check the sensitivity and time estimator, using not only beam maps mentioned in 4. but also scans on other primary and secondary calibrators.(4h)
- Check the noise integration for 6 hours oriented towards deep field measurements, Establish standard faint source photometry (5h mostly high-z faint sources: 10-40 mJy).
- Perform on-sky measurements of polarization at 1 and 2 mm. Use planets, quasars, the Crab Nebula, CasA, and Orion. (30h).
Preparation of the run
October presence at Pico (Dash (-) is for travel with night in the Granada office room on !1stDayAtPico-1, and go down from Pico and travel on FinalDayAtPico+1, X is night at Pico)
Name |
Tue 30 |
Wed 1 |
Thu 2 |
Fri 3 |
Sat 4 |
Sun 5 |
Mon 6 |
Tue 7 |
Wed 8 |
Thu 9 |
Fri 10 |
Sat 11 |
Sun 12 |
Mon 13 |
Tue 14 |
Andrea C. |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
- |
Nicolas P. |
|
|
- |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
- |
Alessia R. |
|
|
- |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
- |
Alain B. |
|
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
X |
- |
Samuel L. |
|
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
X |
- |
Reveret V. |
|
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
X |
- |
Maury A. |
|
|
|
|
|
|
- |
X |
X |
X |
- |
|
|
|
|
Number of people |
1 |
1 |
1 |
3 |
3 |
3 |
3 |
4 |
7 |
7 |
6 |
6 |
6 |
6 |
0 |
Min room requirement* |
1 |
1 |
1 |
2 |
2 |
2 |
2 |
3 |
4 |
4 |
4 |
4 |
4 |
4 |
0 |
* Min room requirement gives the minimal number of room required at the telescope, implying several persons can share room in case the occupancy at the telescope is such that single rooms can't be provided to all.
Presence at Grenoble, for off line data analysis
Name |
Tue 7 |
Wed 8 |
Thu 9 |
Fri 10 |
Sat 11 |
Sun 12 |
Mon 13 |
Tue 14 |
Alessandro M. |
|
|
|
|
|
|
|
|
Martino C. |
|
|
|
|
|
|
|
|
Rémi A. |
|
|
|
|
|
|
|
|
Juan M-P. |
|
|
|
|
|
|
|
|
Xavier D. |
X |
|
X |
X |
X |
X |
|
|
Frederic M |
|
|
|
|
|
|
|
|
Laurence P |
|
|
|
|
|
|
|
|
Guilaine L. |
|
|
|
|
|
|
|
|
Alexandre B. |
|
|
|
|
|
|
|
|
Barbara C. |
|
|
|
|
|
|
|
|
Observations schedule (from telescope schedule)
- 17h30-2h (Local time) on 7 October 2014
- 20h-5h (Local time) on the nights 8-10 October 2014
- 2h-10h on the night 12 October 2014
- 2h-11h on the night 13 October 2014
- 3h-10h30 on the night 14 October 2014
Program
- 1/10 Day-6 (We 1/10): Start cooling down (during mainteinance). Remotely with support in the cabin.
- Days -2 (Su), -1 (Mo), 0 (Tu): KID tuning and technical tests.
- 8/10 Day1. Intens; OTF_geometry Uranus. Pointing model.
- Day2 : Polar; debug
- Day3 : Intens; Validate all sequences
- Day4 : Polar; Planets, quasars
- Day5 : Intens; Validate integration time
- Day6 : Polar; Crab Orion
- Day7 : Backup