Go to preparation run daily reports
Preparation visit before Run6
Daily Reports
Mon 03/06
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.
Tue 04/06
During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar
Start cooling down at 13h30.
Test with VNA at 300K:
figures: VNA scans at 300K (0-8GHz). Left: 1mm array; right: 2mm array.
Installed the electronics,
figures: NIKA installed again