Differences between revisions 12 and 13
Revision 12 as of 2015-02-25 06:06:56
Size: 620
Editor: dhcp-185
Comment:
Revision 13 as of 2015-02-25 14:07:54
Size: 750
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * '''16:30 UT''': Subreflector in place after the holography session. GISMO tunning done succesfully.  * '''16:30 UT''': Subreflector in place after the holography session. GISMO tuning done successfully.
Line 21: Line 21:
 * '''12:00 UT''': Starting the recycling.
 * '''14:30 UT''': Recycling done successfully. Stopped due to bad weather (tau~0.5)

7th GISMO Pool Daily Log

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Starting the recycling.

  • 14:30 UT: Recycling done successfully. Stopped due to bad weather (tau~0.5)

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)