Differences between revisions 1 and 248 (spanning 247 versions)
Revision 1 as of 2017-01-12 10:00:34
Size: 1551
Editor: PabloMellado
Comment:
Revision 248 as of 2022-10-19 19:56:42
Size: 6801
Editor: msanchez
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
= 2017 = = 2022 =
Line 8: Line 8:
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
01; 04.-11.01; G. Paubert;
02; 11.-18.01; A. Bongiovanni + M. Sánchez (EMIR backup); Winter NIKA2 Pool #1;
03; 18.-25.01; I. Myserlis + M. Sánchez (EMIR backup); Winter NIKA2 Pool #2;
04; 25.01-01.02; M. Rodríguez + B. Mancillas + P. Torné (EHT DR); Winter HET Pool #1 + EHT DR;
05; 01.-08.02; I. Myserlis + M. Sánchez (EMIR backup); Winter NIKA2 Pool #3;
06; 08.-15.02; A. Bongiovanni + M. Sánchez (EMIR backup); Winter NIKA2 Pool #4;
07; 15.-22.02; A. Sievers; NIKA2 pool starting a 0h of Tuesday 22nd.
08; 22.02-01.03; A. Bongiovanni + M. Sánchez (EMIR backup); Winter NIKA2 Pool #5;
09; 01.-08.03; I. Myserlis + M. Sánchez (EMIR backup); Winter NIKA2 Pool #6;
10; 08.-15.03; B. Mancillas + G. Paubert; BM on-site on Tuesday. GP on-site since Wednesday;
11; 15.-22.03; M. Rodríguez + P. Torné (EHT) + M. Sánchez; Winter HET Pool #2. EHT slot start on 17 March throughout 28;
12; 22.-29.03; B. Mancillas + P. Torné (EHT) + M. Sánchez; Winter HET Pool #3. EHT slot start on 17 March throughout 28;
13; 29.03-05.04; P. Torné + I. Myserlis; GMVA Spring session 31.03-05.04,
14; 05.-12.04; A. Sievers ; Tests of AETHRA 3mm prototype;
15; 12.-19.04; M. Rodriguez ;
16; 19.-26.04; G. Paubert ;
17; 26.04-03.05; I. Myserlis (remote AOD) ; telescope shutdown postponed to beginning of June;
18; 03.-10.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #4;
19; 10.-17.05; A. Sievers + M. Sánchez (remote); A. Sievers unavailable second half of May;
20; 17.-24.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #5. M. Rodríguez unavailable 19, 20, 21 May;
21; 24.-31-05; A. Bongiovanni; shutdown for on-site upgrade works by first June (postponed to 2023);
22; 27.05-07.06; G. Paubert; holography + wobbler tests + pointing model checks + polarimetry ToO TBC (087-21). Support from SA, PT, IM;
23; 07.-14.06; P. Torné + M. Sánchez (Tuesday afternoon); S. Amarantidis training;
24; 14.-21.06; B. Mancillas; S. Amarantidis training;
25; 21.-27.06; A. Bongiovanni; S. Amarantidis training;
26; 27.06-05.07; M. Sánchez + G. Paubert;
27; 05.-12.07; I. Myserlis; S. Amarantidis training;
28; 12.-19.07; A. Sievers;
29; 19.-26.07; G. Paubert;
30; 26.07-02.08; S. Amarantidis;
31; 02.-09.08; B. Mancillas; EMIR Pool #1
32; 09.-16.08; S. Amarantidis (Tue-Fri) + B. Mancillas (Fri-Tue); remote AOD;
33; 16.-23.08; P. Torné; remote AOD;
34; 23.-30.08; M. Sánchez (Mon-Sat) + G. Paubert (Mon-Fri), I. Myserlis (Sun-Tue, remote);
35; 30.08-06.09; A. Sievers;
36; 06.-13.09; B. Mancillas; EMIR Pool #2;
37; 13.-20.09; I. Myserlis;
38; 20.-27.09; B. Mancillas; EMIR Pool #3;
39; 27.09-04.10; S. Amarantidis;
40; 04.-10.10; P. Torné; GMVA fall session from 06. to 10.10;
41; 10.-18.10; A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #1;
42; 18.-25.10; I. Myserlis + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #2;
43; 25.10-01.11; A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #3;
44; 01.-08.11; A. Sievers;
45; 08.-15.11; I. Myserlis + M. Sánchez (EMIR backup); NIKA2 Pool #4;
46; 15.-22.11; S. Amarantidis + M. Sánchez (EMIR backup); NIKA2 Pool #5;
47; 22.-27.11; A. Bongiovanni + M. Sánchez (EMIR backup); NIKA2 Pool #6;
48;
}}}

= 2021 =

{{{
#!CSV
;;;;
01; 05.-12.01; I. Myserlis; remote AOD;
02; 12.-19.01; A. Bongiovanni + M. Sánchez (EMIR backup); NIKA2 Pool #2;
03; 19.-26.01; B. Ladjelate + M. Sánchez (EMIR backup); remote AOD - NIKA2 Pool #3;
04; 26.01-02.02; M. Rodríguez; HET Pool #1;
05; 02.-09.02; I. Myserlis; remote AOD;
06; 09.-16.02; A. Bongiovanni + M. Sánchez (EMIR backup); NIKA2 Pool #4;
07; 16.-23.02; B. Ladjelate + M. Sánchez (EMIR backup); remote AOD - NIKA2 Pool #5;
08; 23.02-02.03; M. Rodríguez; HET Pool #2;
09; 02.-09.03; G. Paubert;
10; 09.-16.03; A. Bongiovanni + M. Sánchez (EMIR backup); NIKA2 Pool #6;
11; 16.-23.03; B. Ladjelate + M. Sánchez (EMIR backup); remote AOD - NIKA2 Pool #7;
12; 23.-30.03; A. Sievers;
13; 30.03-06.04; I. Myserlis; remote AOD
14; 06.-13.04; M. Rodríguez + P. Torné ; HET Pool #3 + EHT Spring run;
15; 13.-20.04; P. Torné + M. Rodríguez (part-time on-site) + others (as needed) ; HET Pool #4 + EHT Spring run;
16; 20.-27.04; P. Torné; GMVA 3mm Spring run;
17; 27.04-04.05; A. Bongiovanni;
18; 04.05-11.05; I. Myserlis; remote AOD
19; 11.-18.05; G. Paubert;
20; 18.-25.05; A. Sievers;
21; 25.05-01.06; M. Rodriguez + A. Bongiovanni; HET Pool #5 + NIKA2 DDT;
22; 01.-08.06; P. Torne; 1st week of Summer 2021 Semester;
23; 08.-15.06; A. Sievers; Heavy maintenance starts on Monday 14th;
24; 15.-22.06; G. Paubert; Heavy maintenance until Friday 18th;
25; 22.-29.06; P. Torné;
26; 29.06-06.07; M. Rodríguez + A. Sievers (training); Summer HET Pool #1;
27; 06.07-13.07; G. Paubert;
28; 13.-20.07; A. Sievers + M. Rodríguez; Summer HET Pool #2;
29; 20.-27.07; A. Bongiovanni;
30; 27.07-03.08; I. Myserlis; remote AOD
31; 03.-10.08; G. Paubert;
32; 10.-17.08; P. Torné;
33; 17.-24.08; I. Myserlis; remote AOD
34; 24.-31.08; M. Rodríguez; HET Pool #3;
35; 31.08-07.09; M. Sánchez + A. Bongiovanni;
36; 07.-14.09; A. Sievers;
37; 14.-21.09; I. Myserlis; On Monday 20, EMIR heavy maintenance starts, remote AOD;
38; 21.-28.09; G. Paubert; EMIR heavy maintenance ends on Saturday 25th;
39; 28.09-05.10; P. Torné; GMVA Fall session;
40; 05.-12.10; G. Paubert; holograpy sessions Tue-Fri night time;
41; 12.-19.10; M. Rodríguez + B. Mancillas (training); HET Pool #4;
42; 19.-26.10; P. Torné;
43; 26.10-02.11; A. Bongiovanni + M. Sánchez (EMIR backup); Summer NIKA2 Pool #1;
44; 02.-09.11; I. Myserlis + M. Sánchez (EMIR backup); Summer NIKA2 Pool #2;
45; 09.-16.11; A. Sievers ;
46; 16.-23.11; A. Bongiovanni + M. Rodríguez (EMIR backup) + B. Mancillas (training); Summer NIKA2 Pool #3;
47; 23.-30.11; I. Myserlis + M. Sánchez (EMIR backup); Summer NIKA2 Pool #4;
48; 30.11-07.12; G. Paubert; change folding oscillator for outer bands;
49; 07.-14.12; A. Sievers + B. Mancillas (training);
50; 14.-21.12; P. Torné;
51; 21.-28.12; M. Rodriguez; Christmas week;
52; 28.12-04.01; B. Mancillas + M. Sánchez (remote); New Year week;
Line 32: Line 118:
Old AoD Plans:

<<BR>>
Previous AoD Plans 2008-2020:

 * AodSchedule20
 * AodSchedule19
 * AodSchedule18
 * AodSchedule17
Line 42: Line 136:

---

2022

01 04.-11.01 G. Paubert
02 11.-18.01 A. Bongiovanni + M. Sánchez (EMIR backup) Winter NIKA2 Pool #1
03 18.-25.01 I. Myserlis + M. Sánchez (EMIR backup) Winter NIKA2 Pool #2
04 25.01-01.02 M. Rodríguez + B. Mancillas + P. Torné (EHT DR) Winter HET Pool #1 + EHT DR
05 01.-08.02 I. Myserlis + M. Sánchez (EMIR backup) Winter NIKA2 Pool #3
06 08.-15.02 A. Bongiovanni + M. Sánchez (EMIR backup) Winter NIKA2 Pool #4
07 15.-22.02 A. Sievers NIKA2 pool starting a 0h of Tuesday 22nd.
08 22.02-01.03 A. Bongiovanni + M. Sánchez (EMIR backup) Winter NIKA2 Pool #5
09 01.-08.03 I. Myserlis + M. Sánchez (EMIR backup) Winter NIKA2 Pool #6
10 08.-15.03 B. Mancillas + G. Paubert BM on-site on Tuesday. GP on-site since Wednesday
11 15.-22.03 M. Rodríguez + P. Torné (EHT) + M. Sánchez Winter HET Pool #2. EHT slot start on 17 March throughout 28
12 22.-29.03 B. Mancillas + P. Torné (EHT) + M. Sánchez Winter HET Pool #3. EHT slot start on 17 March throughout 28
13 29.03-05.04 P. Torné + I. Myserlis GMVA Spring session 31.03-05.04,
14 05.-12.04 A. Sievers Tests of AETHRA 3mm prototype
15 12.-19.04 M. Rodriguez
16 19.-26.04 G. Paubert
17 26.04-03.05 I. Myserlis (remote AOD) telescope shutdown postponed to beginning of June
18 03.-10.05 B. Mancillas + M. Sánchez (remote) Winter HET Pool #4
19 10.-17.05 A. Sievers + M. Sánchez (remote) A. Sievers unavailable second half of May
20 17.-24.05 B. Mancillas + M. Sánchez (remote) Winter HET Pool #5. M. Rodríguez unavailable 19, 20, 21 May
21 24.-31-05 A. Bongiovanni shutdown for on-site upgrade works by first June (postponed to 2023)
22 27.05-07.06 G. Paubert holography + wobbler tests + pointing model checks + polarimetry ToO TBC (087-21). Support from SA, PT, IM
23 07.-14.06 P. Torné + M. Sánchez (Tuesday afternoon) S. Amarantidis training
24 14.-21.06 B. Mancillas S. Amarantidis training
25 21.-27.06 A. Bongiovanni S. Amarantidis training
26 27.06-05.07 M. Sánchez + G. Paubert
27 05.-12.07 I. Myserlis S. Amarantidis training
28 12.-19.07 A. Sievers
29 19.-26.07 G. Paubert
30 26.07-02.08 S. Amarantidis
31 02.-09.08 B. Mancillas EMIR Pool #1
32 09.-16.08 S. Amarantidis (Tue-Fri) + B. Mancillas (Fri-Tue) remote AOD
33 16.-23.08 P. Torné remote AOD
34 23.-30.08 M. Sánchez (Mon-Sat) + G. Paubert (Mon-Fri), I. Myserlis (Sun-Tue, remote)
35 30.08-06.09 A. Sievers
36 06.-13.09 B. Mancillas EMIR Pool #2
37 13.-20.09 I. Myserlis
38 20.-27.09 B. Mancillas EMIR Pool #3
39 27.09-04.10 S. Amarantidis
40 04.-10.10 P. Torné GMVA fall session from 06. to 10.10
41 10.-18.10 A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup) NIKA2 Pool #1
42 18.-25.10 I. Myserlis + S. Amarantidis (training) + M. Sánchez (EMIR backup) NIKA2 Pool #2
43 25.10-01.11 A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup) NIKA2 Pool #3
44 01.-08.11 A. Sievers
45 08.-15.11 I. Myserlis + M. Sánchez (EMIR backup) NIKA2 Pool #4
46 15.-22.11 S. Amarantidis + M. Sánchez (EMIR backup) NIKA2 Pool #5
47 22.-27.11 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #6
48

2021

01 05.-12.01 I. Myserlis remote AOD
02 12.-19.01 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #2
03 19.-26.01 B. Ladjelate + M. Sánchez (EMIR backup) remote AOD - NIKA2 Pool #3
04 26.01-02.02 M. Rodríguez HET Pool #1
05 02.-09.02 I. Myserlis remote AOD
06 09.-16.02 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #4
07 16.-23.02 B. Ladjelate + M. Sánchez (EMIR backup) remote AOD - NIKA2 Pool #5
08 23.02-02.03 M. Rodríguez HET Pool #2
09 02.-09.03 G. Paubert
10 09.-16.03 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #6
11 16.-23.03 B. Ladjelate + M. Sánchez (EMIR backup) remote AOD - NIKA2 Pool #7
12 23.-30.03 A. Sievers
13 30.03-06.04 I. Myserlis remote AOD
14 06.-13.04 M. Rodríguez + P. Torné HET Pool #3 + EHT Spring run
15 13.-20.04 P. Torné + M. Rodríguez (part-time on-site) + others (as needed) HET Pool #4 + EHT Spring run
16 20.-27.04 P. Torné GMVA 3mm Spring run
17 27.04-04.05 A. Bongiovanni
18 04.05-11.05 I. Myserlis remote AOD
19 11.-18.05 G. Paubert
20 18.-25.05 A. Sievers
21 25.05-01.06 M. Rodriguez + A. Bongiovanni HET Pool #5 + NIKA2 DDT
22 01.-08.06 P. Torne 1st week of Summer 2021 Semester
23 08.-15.06 A. Sievers Heavy maintenance starts on Monday 14th
24 15.-22.06 G. Paubert Heavy maintenance until Friday 18th
25 22.-29.06 P. Torné
26 29.06-06.07 M. Rodríguez + A. Sievers (training) Summer HET Pool #1
27 06.07-13.07 G. Paubert
28 13.-20.07 A. Sievers + M. Rodríguez Summer HET Pool #2
29 20.-27.07 A. Bongiovanni
30 27.07-03.08 I. Myserlis remote AOD
31 03.-10.08 G. Paubert
32 10.-17.08 P. Torné
33 17.-24.08 I. Myserlis remote AOD
34 24.-31.08 M. Rodríguez HET Pool #3
35 31.08-07.09 M. Sánchez + A. Bongiovanni
36 07.-14.09 A. Sievers
37 14.-21.09 I. Myserlis On Monday 20, EMIR heavy maintenance starts, remote AOD
38 21.-28.09 G. Paubert EMIR heavy maintenance ends on Saturday 25th
39 28.09-05.10 P. Torné GMVA Fall session
40 05.-12.10 G. Paubert holograpy sessions Tue-Fri night time
41 12.-19.10 M. Rodríguez + B. Mancillas (training) HET Pool #4
42 19.-26.10 P. Torné
43 26.10-02.11 A. Bongiovanni + M. Sánchez (EMIR backup) Summer NIKA2 Pool #1
44 02.-09.11 I. Myserlis + M. Sánchez (EMIR backup) Summer NIKA2 Pool #2
45 09.-16.11 A. Sievers
46 16.-23.11 A. Bongiovanni + M. Rodríguez (EMIR backup) + B. Mancillas (training) Summer NIKA2 Pool #3
47 23.-30.11 I. Myserlis + M. Sánchez (EMIR backup) Summer NIKA2 Pool #4
48 30.11-07.12 G. Paubert change folding oscillator for outer bands
49 07.-14.12 A. Sievers + B. Mancillas (training)
50 14.-21.12 P. Torné
51 21.-28.12 M. Rodriguez Christmas week
52 28.12-04.01 B. Mancillas + M. Sánchez (remote) New Year week


Previous AoD Plans 2008-2020:

---

AstronomersOnDutySchedule (last edited 2025-04-23 09:26:50 by msanchez)