2024

06 06.-13.02 B. Mancillas (+ M. Sánchez as observer Tue-Fri) HET Pool #1
07 13.-20.02 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #1
08 20.-27.02 I. Myserlis + M. Sánchez (EMIR backup) NIKA2 Pool #2
09 27.02-05.03 A. Sievers
10 05.-12.03 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #3
11 12.-19.03 S. Amarantidis + M. Sánchez (EMIR backup) NIKA2 Pool #4. 3mm VLBI Test NOEMA-30M-100m 18.03, 14:00
12 19.-26.03 G. Paubert
13 26.03-02.04 S. Amarantidis
14 02.-09.04 B. Mancillas + P. Torné + I. Myserlis HET Pool #2 + EHT slots 4.-15.04
15 09.-16.04 A. Sievers + I. Myserlis (Tue-Fri) + P. Torné (Fri-Tue) + M. Sánchez (remote) + B. Mancillas (remote) HET Pool #3 + EHT slots 4.-15.04
16 16.-23.04 P. Torné GMVA 18-23.4
17 23.-30.04 G. Paubert
18 30.04-07.05 A. Bongiovanni + M. Sánchez (also as observers)
19 07.-14.05 S. Amarantidis
20 14.-21.05 B. Mancillas last science week of the semester
21 21.-29.05 G. Paubert holography run 20-23 May. OHB on-site for the next two weeks
35 27.08-03.09 B. Mancillas Start of summer semester. HET Pool #1
36 03.-10.09 P. Torné
37 10.-17.09 I. Myserlis
38 17.-24.09 S. Amarantidis
39 24.09-01.10 A. Bongiovanni Tests of the polarimetry calibrator with NIKA2
40 01.-8.10 G. Paubert + A. Sievers (07.10) comet observations. Holography campaign starts on Monday 7
41 8.-15.10 A. Sievers, P. Torné Holography campaign until 10.10. GMVA campaign window 10-15.10
42 15.-22.10 G. Paubert
43 22.-29.10 B. Mancillas HET Pool #2
44 29.10-05.11 A. Bongiovanni NIKA2 Pool #1
45 05.-12.11 I. Myserlis NIKA2 Pool #2
46 12.-19.11 M. Sánchez
47 19.-26.11 A. Bongiovanni NIKA2 Pool #3
48 26.11-03.12 S. Amarantidis NIKA2 Pool #4
49 03.-10.12 P. Torné VLBI FPT test
50 10.-17-12 G. Paubert holography run
51 17.24.12 A. Sievers
52 24.-31.12 B. Mancillas (from 27.12) + P. Torné if required check with CK for remote/local observers and service
01 31.12-07.01 B. Mancillas
02 07.-14.01 A. Bongiovanni(+G. Paubert) NIKA2 Pool #1. Holography backup run
03 14.-21.01 S. Amarantidis NIKA2 Pool #2
04 21.-28.01 B. Mancillas HET Pool #1

2023

01 03.-10.01 B. Mancillas HET Pool #1
02 10.-17.01 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #2
03 17.-24.01 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #3
04 24.-31.01 S. Amarantidis + M. Sánchez (EMIR backup) NIKA2 Pool #4
05 31.01-07.02 G. Paubert
06 07.-14.02 P. Torné
07 14.-21.02 A. Sievers (till Friday) + M. Sánchez (till Tuesday)
08 21.-28.02 S. Amarantidis

2022

01 04.-11.01 G. Paubert
02 11.-18.01 A. Bongiovanni + M. Sánchez (EMIR backup) Winter NIKA2 Pool #1
03 18.-25.01 I. Myserlis + M. Sánchez (EMIR backup) Winter NIKA2 Pool #2
04 25.01-01.02 M. Rodríguez + B. Mancillas + P. Torné (EHT DR) Winter HET Pool #1 + EHT DR
05 01.-08.02 I. Myserlis + M. Sánchez (EMIR backup) Winter NIKA2 Pool #3
06 08.-15.02 A. Bongiovanni + M. Sánchez (EMIR backup) Winter NIKA2 Pool #4
07 15.-22.02 A. Sievers NIKA2 pool starting a 0h of Tuesday 22nd.
08 22.02-01.03 A. Bongiovanni + M. Sánchez (EMIR backup) Winter NIKA2 Pool #5
09 01.-08.03 I. Myserlis + M. Sánchez (EMIR backup) Winter NIKA2 Pool #6
10 08.-15.03 B. Mancillas + G. Paubert BM on-site on Tuesday. GP on-site since Wednesday
11 15.-22.03 M. Rodríguez + P. Torné (EHT) + M. Sánchez Winter HET Pool #2. EHT slot start on 17 March throughout 28
12 22.-29.03 B. Mancillas + P. Torné (EHT) + M. Sánchez Winter HET Pool #3. EHT slot start on 17 March throughout 28
13 29.03-05.04 P. Torné + I. Myserlis GMVA Spring session 31.03-05.04,
14 05.-12.04 A. Sievers Tests of AETHRA 3mm prototype
15 12.-19.04 M. Rodriguez
16 19.-26.04 G. Paubert
17 26.04-03.05 I. Myserlis (remote AOD) telescope shutdown postponed to beginning of June
18 03.-10.05 B. Mancillas + M. Sánchez (remote) Winter HET Pool #4
19 10.-17.05 A. Sievers + M. Sánchez (remote) A. Sievers unavailable second half of May
20 17.-24.05 B. Mancillas + M. Sánchez (remote) Winter HET Pool #5. M. Rodríguez unavailable 19, 20, 21 May
21 24.-31-05 A. Bongiovanni shutdown for on-site upgrade works by first June (postponed to 2023)
22 27.05-07.06 G. Paubert holography + wobbler tests + pointing model checks + polarimetry ToO TBC (087-21). Support from SA, PT, IM
23 07.-14.06 P. Torné + M. Sánchez (Tuesday afternoon) S. Amarantidis training
24 14.-21.06 B. Mancillas S. Amarantidis training
25 21.-27.06 A. Bongiovanni S. Amarantidis training
26 27.06-05.07 M. Sánchez + G. Paubert
27 05.-12.07 I. Myserlis S. Amarantidis training
28 12.-19.07 A. Sievers
29 19.-26.07 G. Paubert
30 26.07-02.08 S. Amarantidis
31 02.-09.08 B. Mancillas EMIR Pool #1
32 09.-16.08 S. Amarantidis (Tue-Fri) + B. Mancillas (Fri-Tue) remote AOD
33 16.-23.08 P. Torné remote AOD
34 23.-30.08 M. Sánchez (Mon-Sat) + G. Paubert (Mon-Fri), I. Myserlis (Sun-Tue, remote)
35 30.08-06.09 A. Sievers
36 06.-13.09 B. Mancillas EMIR Pool #2
37 13.-20.09 I. Myserlis
38 20.-27.09 B. Mancillas EMIR Pool #3
39 27.09-04.10 S. Amarantidis
40 04.-10.10 P. Torné GMVA fall session from 06. to 10.10
41 10.-18.10 A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup) NIKA2 Pool #1
42 18.-25.10 I. Myserlis + S. Amarantidis (training) + M. Sánchez (EMIR backup) NIKA2 Pool #2
43 25.10-01.11 A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup) NIKA2 Pool #3
44 01.-08.11 A. Sievers
45 08.-15.11 I. Myserlis + M. Sánchez (EMIR backup) NIKA2 Pool #4
46 15.-22.11 S. Amarantidis + M. Sánchez (EMIR backup) NIKA2 Pool #5
47 22.-29.11 A. Bongiovanni + M. Sánchez (EMIR backup) NIKA2 Pool #6. FPT test with P. Torné
48 29.11-06.12 G. Paubert Holo campaign. P. Torné and M. Sánhez will join for the holography
49 06.-13.12 S. Amarantidis + M. Sánchez (EMIR backup) NIKA2 Winter Pool #1
50 13.-20.12 B. Mancillas
51 20.-27.11 P. Torné
52 27.12-03.01 A. Sievers


Previous AoD Plans 2008-2022:

---

AstronomersOnDutySchedule (last edited 2024-11-13 11:14:14 by msanchez)