Status at end of run 3

- Mixture in reserve 605mbar. Note that the manual valve on the reserve is OPEN!

- Al window on cryostat, attached with alu tape. Didn't put the 'laser window' for fear that the wheel of the polarizer might unwillingly be put in place crashing against the laser..

- The laser window is now downstairs, in the NIKA2 closet.

- Also in the NIKA2 closet I left the spectrum analyzer + the small RF components (attenuators et al)

- All the cold ampli are switched off

- All the electronic boards on the other hand are on, as are the synthesizers. Just in case we want to make tests on lecture or acqui. We can switch off the NIKELs from Grenoble, if we want. For the synthesizers, we'll need to ask to the operators.

- The black macbook and the laptot PC with all the MAP programs installed are left in a Mac box in the computer room, together with a few extra informatic stuff (switch, cables..)

- Minimac 35 is off, Mac8 and Mac12 are left on. NIKA2-pc is off as well.

- Note: we have here one of the adapters to refill PT. It is already attached to one of the PT. A set of PT keys is left on the compressor.

- The 'old VNA' and the 2mm NIKEL_dc rack still remain in the cabin. Not much else, I'd say.