1298
Comment:
|
1292
|
Deletions are marked like this. | Additions are marked like this. |
Line 23: | Line 23: |
== '''OBSERVATIONS Log''' == | == OBSERVATIONS Log == |
November 11th 2013, Alain Benoit, Martino Calvo and Andrea Catalano come to the 30m to install, cool down and testing the NIKA prototype.
12-13 November 2013: cooling down, HWP Modulator installation at the pupil (120mm from the cryostat lens)
14 November 2013: OTF geometries on Mars and Uranus. First light of NIKA prototype with polarisation facilities.
15 November 2013: Cryostat back to 300K: 3He-4He mix recovery, heating trap. Polarisation facilities dismantling. Back to Granada.
STATUS
Cryostat Temperature: 150mK (set by temperature control).
Arrays status: 128 pixels 2mm - <1Hz/sqrtHz noise; 201 pixels 1mm about 10Hz/sqrtHz noise
Modulation frequency: 8kHz 1mm, 4kHz 2mm
OBSERVATIONS Log
Opacity is measurd with the taumeter at 225 GHz
p2cor : 0
p7cor : 0
initial Focus : -2.40 mm
Scan |
UT |
Source |
Command |
Az |
El |
Pointing X, Y, Focus |
Tau225 |
Comment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|