Differences between revisions 11 and 17 (spanning 6 versions)
Revision 11 as of 2005-11-30 07:00:26
Size: 749
Editor: visitor15
Comment:
Revision 17 as of 2006-06-05 22:36:44
Size: 1372
Editor: visitor9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
The various directories of the observers in the '''flexible account''' have been moved to the visitor directory to get a cleaner organisation of the account. Nothing has been deleted ! The various directories of the observers in the '''flexible account''' have been moved to the visitor directory to get a cleaner organisation of the account. Nothing has been deleted ! Currently the observers should not use the flexible account, reserved for the database. Ask for the ''hello'' passwd to work in that account.
Line 13: Line 13:
 * ''MOPSIC monitor stop'':
/!\ If a bad fits file is produced (which happens from time to time) the MOPSIC monitor will stop. Don' t forget to restart it.
Just type in MopsicL
 * ''Pointing problems:''
Ask the AoD or the Operator to check the ''firstPhase'' of Abba. Currently it is set to ''Off''.

 * ''MIRA crashing'':
Be sure that the backend Part. number is correct (1mhz 1 2, 4mhz 1 2, vespa 1 2 3 ...). If it is not set correctly MIRA will crash for the reduction.

Tips for Pool Observers

  • Source name:

Be cautious with the source name: don' t put short name (3 letters or less), they could be confused with the local catalogue if the catalogue is not specified. Don't put large name with special characters (*,',etc), it may have confusion during the observations.

  • Observer directories:

The various directories of the observers in the flexible account have been moved to the visitor directory to get a cleaner organisation of the account. Nothing has been deleted ! Currently the observers should not use the flexible account, reserved for the database. Ask for the hello passwd to work in that account.

  • Bolometer pointing:

If you use a small throw you may fit the negative part (off-position) along the az,ele axis. Check the map of the mopsic monitor to be sure of the source position.

  • MOPSIC monitor stop:

/!\ If a bad fits file is produced (which happens from time to time) the MOPSIC monitor will stop. Don' t forget to restart it. Just type in MopsicL

  • Pointing problems:

Ask the AoD or the Operator to check the firstPhase of Abba. Currently it is set to Off.

  • MIRA crashing:

Be sure that the backend Part. number is correct (1mhz 1 2, 4mhz 1 2, vespa 1 2 3 ...). If it is not set correctly MIRA will crash for the reduction.

PoolTips (last edited 2009-04-16 08:26:43 by localhost)