290
Comment:
|
672
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
# attachment:pool-logo.png |
|
Line 6: | Line 7: |
The PoolProject relates the last news and the future project for the Pool. | The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS |
Line 11: | Line 13: |
* PoolW05 | * PoolW0506 == Pool Informations: == * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html |
# attachment:pool-logo.png
This Wiki aims to describe the news and the status of the Pool Observing at the IRAM-30m. The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
Pool Sessions:
Pool Informations:
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html