318
Comment:
|
680
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
#acl StephaneLeon:read,write,admin RosaMontalban:admin,read,write VictorEspigares:admin,read All:read | |
Line 5: | Line 4: |
{{{ attachment:pool-logo.png }}} |
|
Line 7: | Line 9: |
The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS |
|
Line 12: | Line 15: |
* PoolW05 | * PoolW0506 == Pool Informations: == * Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html * Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html |
attachment:pool-logo.png
This Wiki aims to describe the news and the status of the Pool Observing at the IRAM-30m. The PoolProject relates the last news and the future projects for the Pool. To help the observers here are some PoolTips. A special page is dedicated to typical setup/procedure with the New Control System: PoolSetup-NCS
Pool Sessions:
Pool Informations:
Observing Instructions SIS: http://mrt-lx2.iram.es/flexible/pool-hetobs.html
Observing Instructions BOLOMETER: http://mrt-lx2.iram.es/flexible/instruction.html