Differences between revisions 96 and 101 (spanning 5 versions)
Revision 96 as of 2014-05-21 10:59:21
Size: 8837
Editor: gra-lx17
Comment:
Revision 101 as of 2014-06-24 07:55:01
Size: 8796
Editor: gra-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
|| ''last update: 17-Feb-2014'' ||'''Number of KIDs'''||'''Wavelength'''||'''Bandwidth (FWHM)'''||'''NEFD'''||'''HPBW''' || '''FoV'''|| '''Spacing''' ||
||NIKA 1mm band || 196 (136 valid) || 1.25 mm || 220-270 GHz ||     35 mJy*s^1/2^ (preliminary)   || 12.0" || 1.8' || 6.8" ||
||NIKA 2mm band || 128 (114 valid) || 2.00 mm || 137-172 GHz ||     14 mJy*s^1/2^ (preliminary)   || 17.5" || 2.0' || 9.6" ||
|| ''last update: 17-Feb-2014'' ||'''Number of KIDs'''||'''Wavelength'''||'''Bandwidth (FWHM)'''||  '''NEFD'''                   ||'''HPBW''' || '''FoV'''|| '''Spacing''' ||
||NIKA 1mm band    || 196 (136 valid) || 1.25 mm || 220-270 GHz || 35 mJy*s^1/2^ (preliminary) || 12.0" || 1.8' || 6.8" ||
||NIKA 2mm band    || 128 (114 valid) || 2.00 mm || 137-172 GHz || 14 mJy*s^1/2^ (preliminary) || 17.5" || 2.0' || 9.6" ||
Line 103: Line 103:
## == 2nd NIKA pool (October 2014) == == Open runs ==
Line 105: Line 105:
## The 1st NIKA pool will take place from the xxth of October to the xxth of Ocober 2014. === 2nd NIKA pool (Coming soon) ===
Line 107: Line 107:
## === Pool projects and observers === ## === 2nd NIKA pool (November/December 2014) ===
Line 109: Line 109:
## For information about the accepted projects and the observers at the 30m please go to: ## The 2nd NIKA open pool will take place from the 18th of October to the 2nd of December 2014.
Line 111: Line 111:
## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/2ndNIKApool | 2nd NIKA pool organization.]] For information about the accepted projects and the observers at the 30m please go to:
Line 113: Line 113:
## * [[http://www.iram.es/IRAMES/mainWiki/PoolS14 | IRAM 30m pool observers for the Summer 2014 semester.]]  * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/2ndNIKApool | 2nd NIKA pool organization.]]
Line 115: Line 115:
## === Progress === The progress of the pool can be followed via:
Line 117: Line 117:
## The progress of the pool can be followed via:  * [[https://pools.iram.es | Pool data base]]
  
 * [[https://tapas.iram.es/tapas/ | TAPAS]]
Line 119: Line 121:
## * [[https://pools.iram.es | Pool data base]] Both databases are synchronized and can be used to write/read the logsheet.
Line 121: Line 123:
## * [[https://tapas.iram.es/tapas/ | TAPAS]] === 1st NIKA pool (February 2014) ===
Line 123: Line 125:
## Both databases are synchronized and can be used to write/read the logsheet.


== NIKA dry run (May 2014) ==

Two slots of 4 hours have been scheduled for the NIKA dry run:

 * Wed 7th May 2014 from 11:00 to 15:00 (LT)
 * Mon 12th May 2014 from 12:00 to 16:00 (LT)

See the [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/DryRunNIKA | NIKA dry run]] organization wiki.
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/1stNIKApool | 1st NIKA pool organization]]
 * [[http://www.iram.es/IRAMES/mainWiki/PoolW13 | IRAM 30m pool observers for the Winter 2013 semester]]
 * [[http://www.iram.es/IRAMES/mainWiki/NikaRun8 | Internal NIKA team page for organisation]]
Line 138: Line 131:
== Previous runs == == Technical runs ==
Line 140: Line 133:
 * '''1st NIKA pool''' (February 2014)
  * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/1stNIKApool | 1st NIKA pool organization]]
  * [[http://www.iram.es/IRAMES/mainWiki/PoolW13 | IRAM 30m pool observers for the Winter 2013 semester]]
  * [[http://www.iram.es/IRAMES/mainWiki/NikaRun8 | Internal NIKA team page for organisation]]
 * '''9th test run''' (October 2014)
  * [[NikaRun9 | Go to the 9th run Wiki page]]

 * '''May 2014 Dry run'''
  * Two slots of 4 hours scheduled for the NIKA dry run: Wed 7th May 2014 from 11:00 to 15:00 (LT), Mon 12th May 2014 from 12:00 to 16:00 (LT)
  * See the [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/DryRunNIKA | NIKA dry run]] organization wiki.

NIKA

The New IRAM KIDs Array (NIKA) is a Kinetic Inductance Detectors camera for bolometric observations at the IRAM 30m telescope. NIKA has been built by the Institut Néel (IN) and LPSC in Grenoble, France under the lead of Alain Benoit, and with the contributions of other persons forming the NIKA collaboration. In 2013 the main contributing institutes are IN, IRAM, IPAG, LPSC, AIG Cardiff.

Go to the Front Page


Overview

NIKA is a dual band instrument using few hundreds of Kinetic Inductance Detectors (KID). The KID resonances variations which are dependent on the incoming power are probed by a comb of tones allowing to perform frequency domain multiplexing. Being a prototype in constant evolution the arrays characteristics (number of pixels, field of view, sensitivity, etc.) have evolved over the years from each test run to the other. The main characteristics of the latest configuration are summarized on the following table.

last update: 17-Feb-2014

Number of KIDs

Wavelength

Bandwidth (FWHM)

NEFD

HPBW

FoV

Spacing

NIKA 1mm band

196 (136 valid)

1.25 mm

220-270 GHz

35 mJy*s1/2 (preliminary)

12.0"

1.8'

6.8"

NIKA 2mm band

128 (114 valid)

2.00 mm

137-172 GHz

14 mJy*s1/2 (preliminary)

17.5"

2.0'

9.6"

  • Number of KIDs = number of KIDs which resonance is probed with a tone generated by the electronics (in parenthesis = conservative number of KIDs for which no problem has been found in the data). Physically there's 224 KIDs on the 1mm array and 132 KIDs on the 2mm array.
  • NEFD = Noise equivalent flux density outside of the atmosphere = sensitivity.
  • HPBW = Half power beam width = angular resolution.
  • FoV = effective Field-of-View calculated from area covered by all pixels.
  • NIKA is a prototype used to test the technologies to be used in the bigger 6.5' FOV NIKA2 instrument currently in development phase (private Wiki here).

  • Go to the NIKA wish list.


Call for proposals

NIKA is offered for the first time to the community the winter semester 2013/14:


Reports and Publications


Support teams


How-to's


Open runs

2nd NIKA pool (Coming soon)

For information about the accepted projects and the observers at the 30m please go to:

The progress of the pool can be followed via:

Both databases are synchronized and can be used to write/read the logsheet.

1st NIKA pool (February 2014)


Technical runs


Author: Israel Hermelo (IRAM 30m continuum pool manager)

email: hermelo@iram.es

Created: 2013.Dec.16

This page is maintained by IH, CK, SL and the NIKA team

Last update: 2014.Mar.17

NIKA/Main (last edited 2017-02-24 18:57:16 by NikaBolometer)