Differences between revisions 92 and 99 (spanning 7 versions)
Revision 92 as of 2014-03-27 11:02:01
Size: 8836
Editor: 2a00:9ac0:4c:ff0a:221:9bff:fe19:411f
Comment:
Revision 99 as of 2014-06-18 14:17:40
Size: 8903
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
 * Go to the NIKA [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA/WishList | wish list]].
Line 114: Line 115:
Line 125: Line 125:
== NIKA dry run (May 2014) ==

Two slots of 4 hours have been scheduled for the NIKA dry run:

 * 7th May 2014 from 11:00 to 15:00 (LT)
 * 12th May 2014 from 12:00 to 16:00 (LT)

See the [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/1stNIKApool | NIKA dry run]] organization wiki.


## === Pool projects and observers ===

## For information about the accepted projects and the observers at the 30m please go to:

## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/2ndNIKApool | 2nd NIKA pool organization.]]
Line 143: Line 127:
== Previous runs == == Technical runs ==
 * '''9th test run''' (October 2014)
 * [[NikaRun9 | Go to the 9th run Wiki page]]
 * '''May 2014 Dry run'''
 * Two slots of 4 hours have been scheduled for the NIKA dry run: Wed 7th May 2014 from 11:00 to 15:00 (LT), Mon 12th May 2014 from 12:00 to 16:00 (LT)
See the [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/DryRunNIKA | NIKA dry run]] organization wiki.
Line 159: Line 148:
 * '''4th test run''' (June 2012)  * '''4th test run''' (June 2012, final position, final cryostat)
Line 162: Line 151:
 * '''3rd test run''' (October 2011)  * '''3rd test run''' (October 2011, cryogen free 1^st^ cold stage cryostat)
Line 165: Line 154:
 * '''2nd test run''' (October 2010)  * '''2nd test run''' (October 2010, dual band cryostat)
Line 168: Line 157:
 * '''1st test run''' (October 2009)  * '''1st test run''' (October 2009, 1 band cryostat on MAMBO bench, liquid He 1^st^ cold stage)

NIKA

The New IRAM KIDs Array (NIKA) is a Kinetic Inductance Detectors camera for bolometric observations at the IRAM 30m telescope. NIKA has been built by the Institut Néel (IN) and LPSC in Grenoble, France under the lead of Alain Benoit, and with the contributions of other persons forming the NIKA collaboration. In 2013 the main contributing institutes are IN, IRAM, IPAG, LPSC, AIG Cardiff.

Go to the Front Page


Overview

NIKA is a dual band instrument using few hundreds of Kinetic Inductance Detectors (KID). The KID resonances variations which are dependent on the incoming power are probed by a comb of tones allowing to perform frequency domain multiplexing. Being a prototype in constant evolution the arrays characteristics (number of pixels, field of view, sensitivity, etc.) have evolved over the years from each test run to the other. The main characteristics of the latest configuration are summarized on the following table.

last update: 17-Feb-2014

Number of KIDs

Wavelength

Bandwidth (FWHM)

NEFD

HPBW

FoV

Spacing

NIKA 1mm band

196 (136 valid)

1.25 mm

220-270 GHz

35 mJy*s1/2 (preliminary)

12.0"

1.8'

6.8"

NIKA 2mm band

128 (114 valid)

2.00 mm

137-172 GHz

14 mJy*s1/2 (preliminary)

17.5"

2.0'

9.6"

  • Number of KIDs = number of KIDs which resonance is probed with a tone generated by the electronics (in parenthesis = conservative number of KIDs for which no problem has been found in the data). Physically there's 224 KIDs on the 1mm array and 132 KIDs on the 2mm array.
  • NEFD = Noise equivalent flux density outside of the atmosphere = sensitivity.
  • HPBW = Half power beam width = angular resolution.
  • FoV = effective Field-of-View calculated from area covered by all pixels.
  • NIKA is a prototype used to test the technologies to be used in the bigger 6.5' FOV NIKA2 instrument currently in development phase (private Wiki here).

  • Go to the NIKA wish list.


Call for proposals

NIKA is offered for the first time to the community the winter semester 2013/14:


Reports and Publications


Support teams


How-to's



Technical runs

  • 9th test run (October 2014)

  • Go to the 9th run Wiki page

  • May 2014 Dry run

  • Two slots of 4 hours have been scheduled for the NIKA dry run: Wed 7th May 2014 from 11:00 to 15:00 (LT), Mon 12th May 2014 from 12:00 to 16:00 (LT)

See the NIKA dry run organization wiki.


Author: Israel Hermelo (IRAM 30m continuum pool manager)

email: hermelo@iram.es

Created: 2013.Dec.16

This page is maintained by IH, CK, SL and the NIKA team

Last update: 2014.Mar.17

NIKA/Main (last edited 2017-02-24 18:57:16 by NikaBolometer)