Differences between revisions 91 and 102 (spanning 11 versions)
Revision 91 as of 2014-03-18 11:15:50
Size: 8006
Editor: gra-lx17
Comment:
Revision 102 as of 2014-08-25 14:13:41
Size: 8745
Editor: mrt-lx20
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
|| ''last update: 17-Feb-2014'' ||'''Number of KIDs'''||'''Wavelength'''||'''Bandwidth (FWHM)'''||'''NEFD'''||'''HPBW''' || '''FoV'''|| '''Spacing''' ||
||NIKA 1mm band || 196 (136 valid) || 1.25 mm || 220-270 GHz ||     35 mJy*s^1/2^ (preliminary)   || 12.0" || 1.8' || 6.8" ||
||NIKA 2mm band || 128 (114 valid) || 2.00 mm || 137-172 GHz ||     14 mJy*s^1/2^ (preliminary)   || 17.5" || 2.0' || 9.6" ||
|| ''last update: 17-Feb-2014'' ||'''Number of KIDs'''||'''Wavelength'''||'''Bandwidth (FWHM)'''||  '''NEFD'''                   ||'''HPBW''' || '''FoV'''|| '''Spacing''' ||
||NIKA 1mm band    || 196 (136 valid) || 1.25 mm || 220-270 GHz || 35 mJy*s^1/2^ (preliminary) || 12.0" || 1.8' || 6.8" ||
||NIKA 2mm band    || 128 (114 valid) || 2.00 mm || 137-172 GHz || 14 mJy*s^1/2^ (preliminary) || 17.5" || 2.0' || 9.6" ||
Line 28: Line 28:

 * Go to the NIKA [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA/WishList | wish list]].
Line 104: Line 103:
== 1st NIKA pool (February 2014) == == Open runs ==
Line 106: Line 105:
The 1st NIKA pool will take place from the 18th of February to the 28th of February 2014.
Line 108: Line 106:
=== Pool projects and observers ===
=== 2nd NIKA pool (November/December 2014) ===

The 2nd NIKA open pool will take place from the 11th to the 21st of November 2014.
Line 112: Line 113:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/1stNIKApool | 1st NIKA pool organization.]]

 * [[http://www.iram.es/IRAMES/mainWiki/PoolW13 | IRAM 30m pool observers for the Winter 2013 semester.]]

 * [[http://www.iram.es/IRAMES/mainWiki/NikaRun8 | Internal NIKA team page for organisation]]


=== Progress ===
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/2ndNIKApool | 2nd NIKA pool organization.]]
Line 124: Line 118:
  
Line 127: Line 121:
Both databases are synchronized and can be used to write/read the logsheet. Both databases are synchronized and can be used to write/read the logsheet.

=== 1st NIKA pool (February 2014) ===

 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/1stNIKApool | 1st NIKA pool organization]]
 * [[http://www.iram.es/IRAMES/mainWiki/PoolW13 | IRAM 30m pool observers for the Winter 2013 semester]]
 * [[http://www.iram.es/IRAMES/mainWiki/NikaRun8 | Internal NIKA team page for organisation]]
Line 131: Line 131:
== Previous test and commissioning runs == == Technical runs ==

 * '''9th test run''' (October 2014)
  * [[NikaRun9 | Go to the 9th run Wiki page]]

 * '''May 2014 Dry run'''
  * Two slots of 4 hours scheduled for the NIKA dry run: Wed 7th May 2014 from 11:00 to 15:00 (LT), Mon 12th May 2014 from 12:00 to 16:00 (LT)
  * See the [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/DryRunNIKA | NIKA dry run]] organization wiki.
Line 142: Line 149:
 * '''4th test run''' (June 2012)  * '''4th test run''' (June 2012, final position, final cryostat)
Line 145: Line 152:
 * '''3rd test run''' (October 2011)  * '''3rd test run''' (October 2011, cryogen free 1^st^ cold stage cryostat)
Line 148: Line 155:
 * '''2nd test run''' (October 2010)  * '''2nd test run''' (October 2010, dual band cryostat)
Line 151: Line 158:
 * '''1st test run''' (October 2009)  * '''1st test run''' (October 2009, 1 band cryostat on MAMBO bench, liquid He 1^st^ cold stage)
Line 160: Line 167:
Created: 2013.12.16 Created: 2013.Dec.16
Line 164: Line 171:
Last update: 2014.02.17 Last update: 2014.Mar.17

NIKA

The New IRAM KIDs Array (NIKA) is a Kinetic Inductance Detectors camera for bolometric observations at the IRAM 30m telescope. NIKA has been built by the Institut Néel (IN) and LPSC in Grenoble, France under the lead of Alain Benoit, and with the contributions of other persons forming the NIKA collaboration. In 2013 the main contributing institutes are IN, IRAM, IPAG, LPSC, AIG Cardiff.

Go to the Front Page


Overview

NIKA is a dual band instrument using few hundreds of Kinetic Inductance Detectors (KID). The KID resonances variations which are dependent on the incoming power are probed by a comb of tones allowing to perform frequency domain multiplexing. Being a prototype in constant evolution the arrays characteristics (number of pixels, field of view, sensitivity, etc.) have evolved over the years from each test run to the other. The main characteristics of the latest configuration are summarized on the following table.

last update: 17-Feb-2014

Number of KIDs

Wavelength

Bandwidth (FWHM)

NEFD

HPBW

FoV

Spacing

NIKA 1mm band

196 (136 valid)

1.25 mm

220-270 GHz

35 mJy*s1/2 (preliminary)

12.0"

1.8'

6.8"

NIKA 2mm band

128 (114 valid)

2.00 mm

137-172 GHz

14 mJy*s1/2 (preliminary)

17.5"

2.0'

9.6"

  • Number of KIDs = number of KIDs which resonance is probed with a tone generated by the electronics (in parenthesis = conservative number of KIDs for which no problem has been found in the data). Physically there's 224 KIDs on the 1mm array and 132 KIDs on the 2mm array.
  • NEFD = Noise equivalent flux density outside of the atmosphere = sensitivity.
  • HPBW = Half power beam width = angular resolution.
  • FoV = effective Field-of-View calculated from area covered by all pixels.
  • NIKA is a prototype used to test the technologies to be used in the bigger 6.5' FOV NIKA2 instrument currently in development phase (private Wiki here).

  • Go to the NIKA wish list.


Call for proposals

NIKA is offered for the first time to the community the winter semester 2013/14:


Reports and Publications


Support teams


How-to's


Open runs

2nd NIKA pool (November/December 2014)

The 2nd NIKA open pool will take place from the 11th to the 21st of November 2014.

For information about the accepted projects and the observers at the 30m please go to:

The progress of the pool can be followed via:

Both databases are synchronized and can be used to write/read the logsheet.

1st NIKA pool (February 2014)


Technical runs


Author: Israel Hermelo (IRAM 30m continuum pool manager)

email: hermelo@iram.es

Created: 2013.Dec.16

This page is maintained by IH, CK, SL and the NIKA team

Last update: 2014.Mar.17

NIKA/Main (last edited 2017-02-24 18:57:16 by NikaBolometer)